Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
–
A
ppl
ic
at
ion:
G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
11/44
•
The charging station should start working again after any faults have
been fixed. For repairs, contact your local authorised service centre
•
Do not disassemble the internal components of the charging station
without permission; this will void the warranty.
Attention
1.2.
Symbols and icons
Introduces the main safety symbols on the charging station.
Some safety symbols are located on the
charging station. Read and understand the contents of the symbols before installation:
Be careful of high voltage
Complies with the European Standards
Ground connection point
Read this manual before installing the charging station.
Degree of protection of the equipment according to the IEC 70- 1
standard (EN 60529 June 1997).
IP54 means that it is resistant against water and rust, therefore also
suitable for outdoor operation and maintenance.
Table 1 – Symbols present on the charger
’
Smin"“’"
There is residual voltage in the inverter! Before opening the equipment,
wait five minutes to ensure that the capacitance has been completely
discharged.
Be careful of high voltage.
Be careful of high temperature.
Complies with European standards.
Ground connection point.
This indicates the allowed temperature range.
This indicates the degree of protection of the equipment according to
IEC standard 70-1 (EN 60529 June 1997).
Positive pole and negative pole of the input voltage (DC).