Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
–
A
ppl
ic
at
ion:
G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
26/44
4.
Mounting
4.1.
Wall mounting
1)
Identify the installation position and mark the two holes for the wall screws, which will be inserted
in the top rear of the charging station. You can use the hole jig found in the package.
2)
Insert the plugs horizontally into the holes made, paying attention to the force and depth with
which they are inserted (make sure the plug completely enters the hole).
3)
Position the station's support on the wall
4)
Secure the station on the support, as shown in Figure 17
Figure 17 – Wall fixing