Figure3-4 Moving the 20~33KTL-G2 (2)
Step 2
Lift the 20~33KTL-G2 from the packing case and move it to the installation position.
End
Step 1
To determine the position for drilling holes, level hole positions, and then mark the
hole position by using a marker, use the hammer dril to dril hole on the wall. Keeping the
hammer perpendicular to the wall, do not shake when drilling, so as not to damage the walls.
If the aperture errors, need to reposition.
Many 20~33KTL-G2 installation
This topic describes how to move the 20~33KTL-G2 to the installation position
horizontally
Step 1
Opening the packing, insert hands into the slots on both sides of the 20~33KTL-G2
and hold the handles, as shown in Figure 3-3 and Figure 3-4. Two persons are required to
move the 20~33KTL-G2.
Figure 3-3 Moving the 20~33KTL-G2 (1)
3.5 Moving the 20~33KTL-G2
Procedure
Attention
To prevent device damag and personal injury, keep balance when moving the
20~33KTL-G2 because the 20~33KTL-G2 is heavy.
Do not put the 20~33KTL-G2 with its wiring terminals contacting the floor
because the power ports and signal ports are not designed to support the weight
of the 20~33KTL-G2. Place the 20~33KTL-G2 horizontally.
When placing the 20~33KTL-G2 on the floor, put foam or paper under the
20~33KTL-G2 to protect its shell.
3.6 Installing the 20~33KTL-G2
Step 2
The expansion screw is vertically inserted into the hole, pay attention to expanding
screw insertion depth (not too shallow).
Step 3
Putting the rear panel on the wall, the rear panel is fixed by the nuts.
Step 1
Step 2
Step 3
21
22
300mm
100mm
1000mm
200mm
20~33KTL-G2