30
For contractors
%#$$$`
J –
N .
(!
?$''\`&$$
K
a Push the cable grommet over the power cable.
b Break out the cable grommet knock-out in the back panel.
# |%$ +% %+ % % %% !% # % +
moved to the bottom.
d Slide the back panel over the studs and the cable grommet, pull the cable grommet with a pair of pliers
against the locking hooks and let
$$$O\O$'!
#\+" %#\ %
(!
?$''\`
? \% % #\+ % +%#^%+%\%#\%
J
).
? +%++"%! +% # % # %{^++%%q
Please
note:
Mark the type plate with a permanent marker:
Cross out IP 25 and tick the IP 24 box.
4.3 Priority
control
L
When used in conjunction with other electrical equipment, e.g. electric storage heaters, use the maximum
demand relay:
a
Maximum demand relay (see "8. Special accessories").
b
Control cable to the contactor of the second appliance (e.g. electrical storage heater).
c
Control contact, opens when switching the instantaneous water heater ON.
The relay trips as soon as the instantaneous water heater starts.
\$\$'$&''k
'$~!
(!(
j'&$`
%QY| ''&$`
N
(see "8. Special accessories"):
? +¡ \ ^q
(part of the standard delivery of the ZANKER pressure-tested tap).
? +
? { ++% + % %+ % #\+Q++% + + %
delivery of the tap and is designed to hold the tap pipes in the designated location as well as to ensure the
necessary protection against moisture (
M
23).
? Push the tap pipes from above through the support plate up to the lower part of the back panel.
? %+% ++ % $$
? #\ %+ % #\+ % ++% + ++ % +++ %
the back panel.
? }# #%# %++% ++#
The appliance cap needs to be prepared for this installation:
Cleanly break out the knock-outs in the appliance caps (
M
q!!#"
%''`
{ ++# %#%# %" % ++!# #\+ %
part of the appliance with two additional screws (
M
19).
Cap installation:
Hook the appliance cap at the top and pivot it down onto the back panel, then make it audibly click into
+##\ % ++##+% #\+
4.
Alternative installation methods
for contractors
?$''\`&$$\`
`