3
CONFIDENTIAL
DOC-PRO-0049-02
___________________________________________________________________________________________
Z3 Technology, LLC
♦
100 N 8
th
ST, STE 250
♦
Lincoln, NE 68508-1369 USA
♦
+1.402.323.0702
TABLE OF CONTENTS
LIST OF FIGURES
Figure 1 Wrong ribbon cable position ................................................................................... 4
Figure 2 How to fix the ribbon cable in the right position ........................................................... 5
Figure 3 Unscrewing the washer and nut on the BNC connector .................................................... 5
Figure 4 Fan Placement ................................................................................................... 5
Figure 5 Fan Screw Holes .................................................................................................. 6
Figure 6 Fan Screws ........................................................................................................ 6
Figure 7 Nuts ................................................................................................................ 6
Figure 8 Taping the fan wire .............................................................................................. 7
Figure 9 Screwing the PCBA to the enclosure .......................................................................... 7
Figure 10 Location of J15 ................................................................................................. 7
Figure 11 Distance from Switch to LED .................................................................................. 8
Figure 12 Air Duct Dimensions ............................................................................................ 8
Figure 13 Insert Film on Left Side ........................................................................................ 9
Figure 14 Film Placement on Left Side .................................................................................. 9
Figure 15 Correct Film Placement ....................................................................................... 9
Figure 16 Film Placement ................................................................................................. 9
Figure 17 Film Side View ................................................................................................. 10
Figure 18 Film Top View .................................................................................................. 10
Figure 19 Film Placed in Fan Gap ....................................................................................... 10
Figure 20 Incorrect Film Position ........................................................................................ 11
Figure 21 Correct Film Position.......................................................................................... 11
Figure 22 Film Spacing .................................................................................................... 11
Figure 23 Tucked Film .................................................................................................... 11
Figure 24 Installed Film Side ............................................................................................. 12
Figure 25 Installed Film Top ............................................................................................. 12
Figure 26 Partial Closing of Enclosure to Check LED Alignment .................................................... 12
Figure 27 Completed Closed Enclosure ................................................................................. 13
Figure 28 Misaligned LED ................................................................................................. 13
Figure 29 Aligned LED ..................................................................................................... 13
Figure 30 Assembled Top and Bottom Enclosure ...................................................................... 13
Figure 31 BNC Connector Washer ....................................................................................... 14
Figure 32 BNC Connector Nut ............................................................................................ 14
Figure 33 Screws for Enclosure .......................................................................................... 14
Figure 34 Back of Assembled Z3-DME-03 ............................................................................... 14
Figure 35 Front of Assembled Z3-DME-03 .............................................................................. 14