6
5.1 DynaPak 2010L
a. The DynaPak 2010L requires a 3/4" FNPT
pipeline connection.
b. The DynaPak 2010L sampler should be
mounted vertically in a horizontal run of the
pipeline.
c. The end of the sampler probe should penetrate
the center 1/3rd of the pipeline.
d. The end of the sample probe should be cut
parallel to the pipeline.
e. Before applying pipeline pressure to the
DynaPak 2010L, ensure that the isolation valve
and purge valve are closed.
f. After pipeline pressure has been applied to the
sampler, check the probe body/pipeline connection
using a liquid leak detector.
CAUTION:
Incorrect operation of valves (over
tightening) can result in damage to the
valve components (isolation valve
bonnet assembly) which might result in
the valve stem being screwed out of the
probe body. This of course results in
product at pipeline pressure being
vented continually through this port
until this section of the pipeline is shut
in. Be aware of the following
procedures and information.
· DynaPak valves are of soft seat
design and should only be closed
or opened with fingers. No
wrenches should ever be used.
·If a valve will not seal off with
finger tight operation the valve
should have maintenance
performed to allow proper
operation of the valve.
Center 1/3
1/3
1/3
1/3
Center 1/3
1/3
1/3
1/3
5. System Installation