Charging Pile Instructions-V2.0
16
8. Power Distribution
8.1 Input AC Power Distribution Wiring
Input AC Power Distribution: First open the front door of the charging pile, then three-phase
five-wire AC power supply (400VAC) need to be connected successively according to the
input wiring marks A, B and C from left to right. The mark N and PE shall be connected to the
lower zero copper bar and ground copper bar, as shown in figure 8.1.
Figure 8.1 Charging Pile Input AC Wiring Drawing