![Yunca Gas TOMMI Installation Instructions Manual Download Page 12](http://html.mh-extra.com/html/yunca-gas/tommi/tommi_installation-instructions-manual_915824012.webp)
Install-TOMMI - JUN_2020 - 2020-06-18.docx www.yunca.co.nz
Page 12 of 15
7.
Unpack the Ceiling Tile Frame and confirm that the notched out arrows, four positions, align with the
laser cut numbers for the actual slope of your ceiling in degrees. (E.g. 10 degrees being halfway
between “0” and “20” degrees.) Loosen the clamping/retaining screws and make any necessary
adjustments until the frame is sized to match the slope of your ceiling.
Fig 4
– Sloped Ceiling - Angles
8.
Confirm that your rectangle marked out on the ceiling will take the correctly adjusted Ceiling Tile Frame,
and is correctly positioned up and down slope.
9.
Cut out the ceiling rectangle. - You can cut around the outside of the line.
10.
Confirm the Ceiling Tile Frame will fit in the hole and looks appropriate.
11.
Frame out the sides of the cut-out from within the room, or from the ceiling cavity (if you have access)
to support the sides of the Ceiling Tile Frame when installed.
12.
Install the Ceiling Tile Frame up against the ceiling and attach it to the blocking, using screws through
the long slots in the predrilled/slotted mount tabs (You may yet wish to slide the Ceiling Tile Frame up
or down the slope of the ceiling). Caution: The edges of the frame are sharp.
ANGLE
L
0
558
5
559
10
562
15
568
20
576
25
588
30
603
35
622
40
646
45
677