09-06-01
Page 6 of 6 op-instruct-leedz-ib.doc
CLEARANCES
The YUNCA LEEDZ INBUILT FLUED GAS HEATER should be installed with clearances equal to or
greater than those recommended below and comply with NZS 5261.
CONNECTING THE FAN
The fan should be connected to the mains supply (240V 50Hz) via the 3m flex and 3pin plug provided.
The cord is stored and attached to the cowl for freighting.
When inserting the heater into the cavity, the cord should be attached to the side of the cowl using the
wire tie provided to stop it being fouled under the heater.
Allowance may need to be made on one side of the cavity for the cord sit if it is to be connected into an
external plug.