background image

Revised 04/04/08

ALLURE MANUAL Control -Indoor  Install Apr08

Page 6 of 20

ZERO CLEARANCE GAS FLUE KIT (3.6m): INSTALLATION INSTRUCTIONS

Yunca Gas ALLURE OPEN FIRE 630, 730 (150mm dia flue), 930 (200mm flue)

This flue kit has been manufactured in accordance with NZS 5261:1996. To ensure safety this flue kit must
be installed as outlined in these instructions. Appliance and flue clearances from combustible walls must
be in accordance with heater manufacturers specifications and NZS 5261:1996.
1) Locate heater in its proposed position and mark the points for penetration that are directly above the
centre of the heater’s flue outlet. Check that the heater’s location allows the OUTER HEAT SHIELD to clear
all structural timbers.
2) Cut 250mm square holes (930 requires 300mm square holes) where penetration is required to
accommodate OUTER HEAT SHIELD.

NB:  A  minimum  25mm  clearance  is  required  between  OUTER  HEAT  SHIELD  and
combustible SURFACES

.

3) Fit timber nogs around holes where necessary.

4) Assemble OUTER HEAT SHIELD lengths together ensuring seams are in line and
secure with 3 rivets or self-tapping screws. Lower OUTER HEAT SHIELD through
the  roof  or  chimney  structure  and  fit  to  heater  spigot.  Check  height  the  OUTER
HEAT SHIELD penetrates roof or chimney structure.
The flue is required to be at least 500mm above the nearest point on any part of the
roof.  It  is  recommended  that  in  some  instances  extending  the  flue  above  the
ridgeline will be necessary.  Refer to NZS 5261:1996 for more information. Additional
HEAT  SHIELDS  may  have  to  be  added  to  ensure  the  correct  roof  penetration
heights are obtained.

5) Assemble the 150mm 

(930 model uses 200mm)

 stainless steel FLUE PIPES

together ensuring all seams are in line using 3 pop rivets or screws and seal joints
with appropriate sealant. (Use ST/ST rivets or screws)

6) Fit FLUE SPACER BRACKETS to FLUE if necessary to maintain air gap between
FLUE PIPES and OUTER HEAT SHIELD.

7) Lower stainless steel FLUE PIPES from the roof into the OUTER HEAT SHIELD
(crimped ends towards heater) and into the heater flue outlet. Lift OUTER HEAT
SHIELD for access and seal flue to heater stub.

8) Secure OUTER HEAT SHIELD to heater, if necessary.

9)  Using  ANGLE  BRACKETS  secure  OUTER  HEAT  SHIELD  to  nogs  around
penetration holes. 

NB A

 

minimum 25mm clearance is required between OUTER

HEAT SHIELD and combustible surfaces

10) Fix an appropriate flashing around the OUTER HEAT SHIELD to seal onto the
roofing or chimney material.

11) Fix TOP FLUE SPACER BRACKET to the flue making sure lugs fit snugly inside OUTER HEAT SHIELD.

12) Fit GAS COWL into FLUE pushing down fully onto TOP SPACER BRACKET. Secure with a self-tapping stainless
steel screw.

YUNCA ZERO CLEARANCE FLUE KIT CONTENTS:
630 & 730 Models

3 x 150mm x1200mm StSt Flue

1 x 200mm x 1200mm Galv liner (plain both ends)

1 x Std Gas cowl

2 x 200mm x 1200mm Galv liner (swaged one end)

1 x Bottom spider 

2 x inner / outer flue spacers

930 Model

3 x 200mm x1200mm StSt Flue

1 x 250mm x 1200mm Galv liner (plain both ends)

1 x Std Gas cowl

2 x 250mm x 1200mm Galv liner (swaged one end)

1 x Bottom spider 

2 x inner / outer flue spacers

N.B. It is the responsibility of the installer to ensure that the installation of this flue kit
complies with the appliance manufacturers specifications for flues and those relevant
Local Body requirements are adhered to. 

Also refer to page 7.

Flue pipe
to be no
more than
25mm
higher
than outer
liner

Outer:
plain both
ends

Outer:
swaged
one end

Summary of Contents for ALLURE

Page 1: ...door Install Apr08 Page 1 of 20 ALLURE GAS OPEN FIRE INDOOR MANUAL CONTROL MODELS 930 730 630 APRIL 2008 INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION These instructions should be stored in a convenient safe place for ready reference ...

Page 2: ...dix A FAULT FINDING GUIDE 15 16 Appendix B SPARE PARTS LIST 17 18 Appendix C WARRANTY 19 Appendix D WARRANTY REGISTRATION 20 INTRODUCTION Welcome and congratulations on purchasing your YUNCA ALLURE INDOOR MANUAL CONTROL flued gas open fire Please read these Operating Instructions carefully before attempting to operate the heater and ensure all members of your home understand how this elegant heate...

Page 3: ...ANCE DO NOT USE OR STORE FLAMMABLE MATERIALS NEAR THIS APPLIANCE DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHILE IT IS OPERATIONAL ENSURE THAT HOME VENTILATION SYSTEMS DO NOT AFFECT THE DRAW OR FLAME PATTERN OF THE FIRE STAINLESS STEEL FASCIAS are shipped with protective plastic in place to reduce the risk of damage in transit Remove this plastic immediately before fitting the fascia...

Page 4: ...00 940 200 250 Also available is a Bottom Fascia Strip for each model This strip 730 930 85 mm high 630 55mm high is fitted below a regular three sided fascia for a picture frame look CLEARANCES Floor protector 300mm in front of and 100mm from side of firebox opening 6mm minimum thickness using heat resistant materials Built in heat cell zero clearance requires minimum 25mm from combustibles all a...

Page 5: ...ent approaches with air venting but both require the use of zero clearance flue kits 1 For dedicated chimney chases NOT open to the roof ceiling cavity The chase must be vented at the bottom near the base level of the fireplace with 2 individual vents preferably one each side of the fire each with a minimum size of 100mm x 50mm opening Identical vents must be repeated near the top of the chase pre...

Page 6: ...50mm 930 model uses 200mm stainless steel FLUE PIPES together ensuring all seams are in line using 3 pop rivets or screws and seal joints with appropriate sealant Use ST ST rivets or screws 6 Fit FLUE SPACER BRACKETS to FLUE if necessary to maintain air gap between FLUE PIPES and OUTER HEAT SHIELD 7 Lower stainless steel FLUE PIPES from the roof into the OUTER HEAT SHIELD crimped ends towards heat...

Page 7: ...oof b In the case of a Flat roof ie With a Pitch of less than 30 not less than 1500 mm above the Highest Point of the Roof c In any case the length of the Flue shall be not less than 3 6 metres from the Top of the Appliance Flue Spigot 2 Minimum Total Flue Length 3 6 metres 3 Flue must be 1 2 metres high before any Lateral is fitted 4 Any Lateral run in a Flue shall be a No more than 1 0 metre in ...

Page 8: ...ed to be completed before the heater is finally positioned Fig 2 6mm dia x 50mm Coach Bolts Supplied If the appliance is being attached to a concrete floor dyna bolts should be used if the floor is wooden the bolts used should be long enough to go fully through the floorboards and fixed with nuts and washers from the underside Fig 1 Fig 2 Bolt Points Test Point 30 mm 15 mm 15 mm 80 mm Gas Pipe Hol...

Page 9: ... compounds to the first two threads at the tip of any gas connection All joints should be tested for leaks before operating the fire Gas pressure requirements Correct gas pressure and the use of a properly sized gas supply line are essential for the safe and efficient performance of this appliance The inlet and outlet pressures at the control must be tested on installation Note Improper gas pressu...

Page 10: ...ure can be tested at the test nipple on the side of the BM 733 control Operating pressure is adjusted at either the LPG or NG in line regulator Gas Type Pressures and jet sizes appear on data plate The Allure Heater uses the BM733 control valve a functional view of this is shown below Legend to functional diagram 1 Valve body top section 6 Disk valve 11 Pressure test nipple 2 Valve body bottom sec...

Page 11: ...ASCIA STRIP Not shown This part may be fitted along the base of a regular three sided fascia to give a picture frame effect When the fascia front is removed you will see where the bottom strip is fitted using two screws 4 TOP LOUVRE 1 Top Slides out 5 TOP LOUVRE 2 Bottom Remove 2 screws and slide off 6 BOTTOM CONTROL AND GRILL Remove 2 screws and lift out 7 COWL TOP FRONT Remove 2 screws and slide...

Page 12: ... Remove screw from centre hole and lift out 5 Rear Tray Remove screw from right and left side lift out 6 Burners Lift out 7 Manifold Baffle Lift out left and right baffles SETTING THE FIRE 1 Replace all panels and grate 2 Check for Gas Ignition operation of flame and fan before setting the fire 3 Follow layout see following pages for setting of the fire 4 Re check gas ignition control operation et...

Page 13: ...630 uses 8 coals per row layout as shown below from left to right Coals are numbered on the base Bottom Rear Row Bottom Front Row Top Rear Row Top Front Row 930 26 x No1 Coals 26 x No2 Coals 4 rows of 13 730 20 x No1 Coals 20 x No2 Coals 4 rows of 10 630 16 x No1 Coals 16 x No2 Coals 4 rows of 8 2 1 2 1 2 1 2 2 1 1 1 2 1 2 1 2 1 2 1 2 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 1 2 2 1 2 1 2 2 1 1...

Page 14: ...yout shown is for the 930 model using 13 coals per row The 730 model uses 10 coals per row the 630 uses 8 coals per row layout as shown below from left to right Coals are numbered on the base Rear Row Front Row Logs Refer photos below 630 1 x B 1 x C 1 x D 730 1 x B 2 x C 1 x D 930 2 x B 2 x C 2 x D 1 2 1 2 1 2 1 2 1 2 2 1 2 1 2 1 2 1 2 1 2 1 1 2 2 1 630 730 C B D 930 ...

Page 15: ...ps 1 3 4 The control knob can now be turned further anti clockwise left to the ON position to fully light the fire Adjust flame height and heat output as required 5 Adjust Fan speed switch to achieve the optimum speed High switch up Low switch down Off switch centred Yunca recommends the use of the fan boost to achieve more efficient gas use Turning off 1 Turn control knob clockwise to the off pos...

Page 16: ...e back of the Fire for blockages around the air intake slots Check that the clearances around the appliance match those stated in this manual Flueway blocked Remove blockage Check cowl LPG gas mix incorrect Contact supplier to clean out bottle Flame Height very large or very low Check gas inlet pressure and running pressure Check and set gas pressure to manufacturers specifications Main burners ex...

Page 17: ...d Assembly No Jets 6624GO Fan Assembly Main Gas Pipe NAT Burner Plug Insert 6950A1 Coal No 1 6950A2 Coal No 2 6950B Log B 6950C Log C 6950D Log D Duroboard 6955GO6 Rear Tray 630 6956GO6 Front Tray 630 6958GO6L Manifold Baffle Left hand Side 630 6958GO6R Manifold Baffle Right Hand Side 630 6955GO7 Rear Tray 730 6956GO7 Front Tray 730 6958GO7L Manifold Baffle Left hand Side 730 6958GO7R Manifold Baf...

Page 18: ...tural Main Jets ALL 1 2 mm dia 930 model LPG MAIN JETS 1 2 3 4 5 6 7 8 9 10 0 6 0 7 0 7 0 8 0 8 0 8 0 8 0 7 0 7 0 6 930 model Natural Main Jets ALL 1 2 mm dia Fascia Panels Should you require replacement fascia panels please also supply the measurements as there have been some design changes over time Name Stainless Steel Gunmetal Black Silver Fascia Front three sides Fascia Front bottom strip onl...

Page 19: ...as Dunedin 03 488 4342 This warranty is void if the recommended service schedule is not implemented as suggested in this manual and carried out by a suitably qualified person Limitations of Liabilities Yunca Heating hereby waivers any liability for incidental and consequential damage directly or indirectly sustained or for any loss caused by the application of this product not in accordance with t...

Page 20: ... By Date Manufactured by Yunca Gas Dunedin PO Box 500 DUNEDIN 9054 Telephone 03 488 4342 Email yuncagas southnet co nz Cut here and return MANUFACTURER COPY This section must be returned within 10 days of purchase YUNCA ALLURE INDOOR MANUAL CONTROL WARRANTY REGISTRATION Serial Model No Gas Type LPG NAT Purchasers Name Purchase Date Purchasers Address City Postcode Telephone Where Purchased Install...

Reviews: