4.3 PV Rapid Shutdown Equipment (PVRSE)
This product is PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section
690.12, for AC and DC conductors, when installed according to the following requirements:
1)
Microinverters and all DC connections must be installed inside the array boundary.
2)
The array boundary is defined as 305 mm (1 ft.) from the array in all directions, or 1 m (3 ft.) from the
point of entry inside a building.
This rapid shutdown system must be provided with an initiating device and (or with) status indicator
which must be installed in a location accessible to first responders, or be connected to an automatic
system which initiates rapid shutdown upon the activation of a system disconnect or activation of another
type of emergency system.
The initiator shall be listed and identified as a disconnecting means that plainly indicates whether it is in
the “off” or “on” position. Examples are:
1)
Service disconnecting means
2)
PV system disconnecting means
3)
Readily accessible switch or circuit breaker
The handle position of a switch or circuit breaker is suitable for use as an indicator. Refer to NEC for more
information.
Additionally, in a prominent location near the initiator device, a placard or label must be provided with a
permanent marking including the following wording:
’PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN’ The term ‘PHOTOVOLTAIC’ may be replaced
with ‘PV.’
Refer to NEC 690.65 to ensure placard meets all audit requirements.
9
Summary of Contents for DPI-208
Page 1: ...Installation User manual Ver 1 0 September 2022 DPI 208 DPI 480...
Page 24: ...10 DPI 208 and DPI 480 Accesories 10 1 Wiring Diagram 22...
Page 25: ...10 DPI 208 and DPI 480 Accesories 10 2 Accesories Summary 23...
Page 26: ...Yotta DPI 208 and DPI 480 Microinverter Energy Communication Unit Warranty Card Warranty Card...