JOHNSON CONTROLS
170
FORM 150.72-NM3 (1020)
ISSUE DATE 10/05/2020
SECTION 8 – UNIT OPERATION
RETURN CHILLLED LIQUID SYSTEM LEAD/
LAG AND COMPRESSOR SEQUENCING
A lead/lag option may be selected to help equalize
average run hours between systems with two refrigerant
systems. This may be programmed under the OPTIONS
key. Auto Lead/Lag of the two systems based on average
run hours of the compressors in each system. Manual
Lead/Lag specifically selects the sequence in which the
microprocessor board starts the systems.
The microprocessor board will sequence compressors
load and unload systems according to Table 16. The
microprocessor will lead/lag compressors within each
circuit to maximize individual compressor run time
for the purpose of lubrication. It will also prevent the
same compressor from starting two times in a row. The
microprocessor board will not attempt to equalize run
time on individual compressors within a system.
Each compressor in a system will be assigned an
arbitrary number 1 or 2. The non-running compressor
within a system with the lowest priority number will
always be the next compressor to start. The running
compressor with priority number 1 will always be the
next compressor to shut off. Whenever a compressor is
shut off, the priority numbers of all compressors in each
system will be decreased by 1 with the wrap around.
This control scheme assures the same compressor does
not repeatedly cycle on and off.
Notes:
1. Step 1 is Hot Gas Bypass and is skipped when loading occurs. Hot Gas Bypass operation is inhibited during Pumpdown.
2. Step 3 is skipped when loading occurs.
3. Step 4 is skipped when unloading occurs.
TABLE 15 – RETURN CHILLED LIQUID CONTROL FOR 4 COMPRESSORS (6 STEPS)
* STEP can be viewed using the OPER DATA key and scrolling to COOLING DEMAND.
*STEP
COMPRESSOR
COMPRESSOR ON POINT
COMPRESSOR OFF POINT
0
0
SETPOINT
SETPOINT
1
1 W/HGB
SP + CR/8 (Note 1)
SETPOINT
2
1 NO HGB
SP + CR/4
SP + CR/8
3
2
SP + 2*CR/4 (Note 2)
SP + CR/4
4
2
SP + 2*CR/4
SP + CR/4
(Note 3)
5
3
SP + 3*CR/4
SP + 2*CR/4
6
4
SP + CR
SP + 3*CR/4
LEAD SYSTEM
LAG SYSTEM
Step
COMP 1
COMP 2
-
See NOTE 1
See NOTE 2
See NOTE 3
COMP 1
COMP 2
-
0
OFF
OFF
-
OFF
OFF
-
1
ON + HG
OFF
-
OFF
OFF
-
2
ON
OFF
-
OFF
OFF
-
3
ON
OFF
-
ON
OFF
-
4
ON
ON
-
OFF
OFF
-
5
ON
ON
-
ON
OFF
-
6
ON
ON
-
ON
ON
-
NOTES
1. Step is Hot Gas Bypass and is skipped when loading occurs. Hot Gas Bypass operation is inhibited during pumpdown. For Leaving Chilled
Liquid Control the Hot Gas Bypass solenoid is energized only when the lead compressor is running and the LWT < SP, the Hot Gas Bypass
solenoid is turned off when the LWT > SP + CR/2.
1. Step 1 is not used for loading or unloading.
2. Step 3 is skipped when loading occurs.
3. Step 4 is skipped when unloading occurs.
TABLE 16 – RETURN CHILLED LIQUID CONTROL FOR 4 COMPRESSORS (6 STEPS)
Summary of Contents for YLAA0195HE
Page 57: ...57 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 59: ...59 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 61: ...61 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 65: ...65 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 67: ...67 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 69: ...69 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 71: ...71 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 73: ...73 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 75: ...75 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 77: ...77 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 79: ...79 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 81: ...81 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 83: ...83 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 85: ...85 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 87: ...87 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 91: ...91 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 93: ...93 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 95: ...95 JOHNSON CONTROLS FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 SECTION 5 TECHNICAL DATA 5 5...
Page 204: ...JOHNSON CONTROLS 204 FORM 150 72 NM3 1020 ISSUE DATE 10 05 2020 NOTES...