![York YHGS Installation Instructions Manual Download Page 4](http://html1.mh-extra.com/html/york/yhgs/yhgs_installation-instructions-manual_4255116004.webp)
ENGLISH
4
2.1. GEYSIR & GEYSIR WITH PASSIvE COOLING
2. HEAT PUMP INFORMATION
Dimensions and connections (YHGS / YPGS)
The brine lines can be connected on either the left or right-hand
sides of the heat pump.
Figure 1: Geysir, Geysir with Passive cooling Dimensions and
connections.
Q
Brine in, 28 Cu
W
Brine out, 28 Cu
E
Heating system supply line, 22 Cu: 4-10 kW,
28 Cu: 12-16 kW
R
Heating system return line, 22 Cu: 4-10 kW,
28 Cu: 12-16 kW
T
Expansion line, 22 Cu
Y
Lifting point
U
Hot water line, 22 Cu or stainless steel
I
Cold water line, 22 Cu or stainless steel
O
Lead-in for supply, sensor and communication
cables
11
0
1845 (±10)
455
596
528
300
440
40±10
2
1
549
344
610
327
40
80
74
56
80
4
7 8
6
5
9
3