PREPARATION BEFORE INSTALLATION 

4.1 Confirm the position of suspension bolts 

z

Refer to Fig. 2 to see the diameter of suspension 
hole and confirm the bolt location. 

z

Install an inspection opening on the control box 
side for convenient maintenance and inspection 
of the parts such as electrical parts, refrigerant 

connection nuts, temperature sensors, EXV coil, 
drain pump (if it has), etc. The inspection 
opening size should be no smaller than 450

h

450 

mm2. 

z

Also inspection opening for repairing should be 
installed in the ceiling right below the unit. The 
size should be no smaller than the unit diameter 
B

h

E shown in the Fig. 2. 

 
YDCC06~45 /YDCC018~112 Indoor Units 

       

 

Models A 

YDCC066/078 1205 

1235 1450  1213  222 

YDCC095/115 1505 

1535 1780  1513  237 

*Note: indoor unit series type of A, B, C and D is determined by the specific letter in the bar code on the unit. For 
example, indoor unit YDCC*****-*C* means C type series unit and YDCC*****-*B* means B type. 

 
YDCC50~60 /YDCC140~175 Indoor Units

   

⎆ㅵ

⇨ㅵ

$%ᴎൟ

Ħ

Ħ

&'ᴎൟ

Ħ

Ħ

$%ᴎൟ

Ħ

Ħ

&'ᴎൟ

Ħ

Ħ

<'&&
<'&&

<'&&
<'&&

᥹ㅵሎᇌ㸼

᥹ㅵ໪ᕘሎᇌPP

ᴎ㒘ൟো

Fig. 2 Indoor Unit Diameter

Models

A

B

C

D

E

YDCC018/020/

025

605

630

830

609

681

YDCC034

805

830

1030

809

881

YDCC045/053

910

935

1150

914

986

Summary of Contents for YDCC06-45

Page 1: ...YORKVRFAir Conditioner 250 12 YDCC IOM English YGF 0911 Installation Manual...

Page 2: ...TY CONSIDERATIONS 2 BEFORE INSTALLATION 2 3 SELECTING INSTALLATION SITE 2 4 BEFORE INSTALLATION 3 5 INDOOR UNIT INSTALLTION 4 6 REFRIGERANT PIPING WORK 4 7 DRAIN PIPING WORK 6 8 INSTALLING THE DUCT 7...

Page 3: ...the doors and windows immediately to ventilate the room thoroughly z Toxic gas may be produced if the refrigerant comes in contact with fire such as a fan heater stove or cooking device z Power off t...

Page 4: ...tdoor unit 3 SELECTING INSTALLATION SITE z If it has the possibility that the temperature and humidity inside the ceiling might exceed 30 C and RH80 please reinforce the insulation on the unit Use gla...

Page 5: ...0 mm2 z Also inspection opening for repairing should be installed in the ceiling right below the unit The size should be no smaller than the unit diameter BhE shown in the Fig 2 YDCC06 45 YDCC018 112...

Page 6: ...installed within the hanger bracket for fear of bolt rolling out this may result in danger 6 REFRIGERANT PIPING WORK z Execute insulation completely on both sides of the gas piping and the liquid pipi...

Page 7: ...nt piping and let the pressure slowly rise to 4 15MPa b The specified pressure should be maintained for 10 minutes and then soapy water or other foaming agent are applied to the connection positions s...

Page 8: ...Central Drain Pipe z For the indoor unit with pump drainage a Be sure the drain raising pipe height is within 700mm b Place the drain raising pipe vertically and make sure it is no further than 300mm...

Page 9: ...rding to the actual pressure drop of the air duct z Indoor unit ESP can be adjusted by changing the connection site of fan wiring in the control board For detail setting method of different indoor ESP...

Page 10: ...system while the other indoor units are controlled by another switch 10 4 Indoor unit field wiring z For detail indoor unit wiring see the Wring Diagram attached to the control box lid when laying the...

Page 11: ...oller can connect to max 4 indoor units Note indoor unit series type of A B C and D is determined by the specific letter in the bar code attached on the unit For example indoor unit YDCC C means C typ...

Page 12: ...721239 YDCC IOM English YGF 0911 NOTHING...