background image

5012886-YIM-B-0517

24

Johnson Controls Unitary Products

R

24 VAC hot for switched inputs to the UCB

Connects through circuit trace to the thermostat connection 
strip R terminal, right FAN OVR pin, right HPS1 pin, right HPS2 
pin, lower DFS pin and lower APS pin

Terminal Thermostat connection strip on left edge of UCB

W1

1st stage heating request, 24 VAC input switched 
from R

Not effective for cooling-only units

W2

2nd stage heating request, 24 VAC input switched 
from R

Not effective for cooling-only units or units with single-stage 
heat sections

Y1

1st stage cooling request, 24 VAC input switched 
from R

Y2

2nd stage cooling request, 24 VAC input switched 
from R

Visible in the display menu when the #ClgStgs parameter is set 
for 2 or more, also effective for economizer free cooling supply 
air temperature reset when the #ClgStgs parameter is set for 1 
or more

G

Continuous indoor blower request, 24 VAC input 
switched from R

OCC

Occupancy request, 24 VAC input switched from 
R

Must have the OccMode parameter set for External to be 
effective

X

Hard lockout indicator, 24 volt output to a light 
thermostat LED

R

24 VAC hot for thermostat switching and power

If field-added external accessories for unit shutdown are used, 
24 VAC hot return from smoke detector, condensate overflow 
and/or user shutdown relay switching in series

SD-24

If field-added external accessories for unit 
shutdown are used, 24 VAC hot out for smoke 
detector, condensate over- flow and/or user 
shutdown relay switching in series

Unit wiring harness jumper plug for factory shutdown 
accessories must be removed if the switching of field-added 
external accessories for unit shutdown are wired between 
thermo- stat connection strip SD-24 and R

C

24 VAC common for thermostat power

LEDs on left edge of UCB

POWER

Green UCB power indicator

Lit indicates 24 VAC is present at C and 24V terminals

FAULT

Red hard lockout, networking error and firmware 
error indicator

1/2 second on/off flashing indicates one or more alarm is 
currently active, 1/10th second on/off flashing indicates a 
networking error (polarity, addressing, etc.) or a firmware error 
(likely correctable with re-loading from USB flash drive)

SA BUS

Green UCB SA bus communication transmission 
indicator

Lit/flickering indicates UCB SA bus communication is currently 
active, off indicates the
UCB is awaiting SA bus communication

Terminal Space temperature sensor connections at center on upper edge of UCB

ST

Space Temperature sensor input from 10K

 @ 

77°F, Type III negative temperature coefficient 
thermistor

Positive of VDC circuit (3.625 VDC reading to COM with open 
circuit), effective if “Thermo- stat-only Control” parameter is set 
OFF, space sensor override momentary shorts ST to COM to 
initiate/terminate temporary occupancy

COM

Common for ST and SSO inputs

Negative of VDC circuit for ST and SSO inputs

SSO

Space Sensor Offset input from 0 to 20K

 

potentiometer

Positive of VDC circuit (3.625 VDC reading to COM with open 
circuit), 10K

/2.5 VDC is 0°F offset, 0

/0 VDC is maximum 

above offset and 20K

/3.4 VDC is maximum below offset from 

active space temperature setpoint

Table 9:

Smart Equipment™ UCB Details (Continued)

Description

Function & Comments

Summary of Contents for YD360 Series

Page 1: ...Unit 9 6 Unit Dimensions Inches 14 7 Piping And Electrical Connection Sizes 30 40 50T Inches 16 8 Electrical Power Knockout Sizes Inches 16 9 Smart Equipment UCB Details 23 LIST OF FIGURES 1 Corner We...

Page 2: ...50 Ton C00 Cooling Only Product Options AA None TA Technicoat Condenser Coil Installation Options A None 2 208 230 3 60 4 460 3 60 5 575 3 60 Configured Split Condenser Model Number Nomenclature A St...

Page 3: ...n the carrier s freight bill A separate request for inspection by the carrier s agent should be made in writing Improper installation may create a condition where the operation of the product could ca...

Page 4: ...em Scroll Tandem Scroll Quantity 2 2 2 Cooling Nominal Capacity Tons System 1 15 20 25 System 2 15 20 25 Capacity Stages System 1 2 2 2 System 2 2 2 2 SYSTEM DATA No Refrigeration Circuits 2 2 2 Sucti...

Page 5: ...ngth to support the unit The condensing unit must be mounted on level supports The supports can be channel iron beams or wooden beams treated to reduce deterioration Minimums of two 2 beams are requir...

Page 6: ...on of vibration Holes are provided in the base rails for bolting the unit to its foundation For ground level installations precautions should be taken to protect the unit from tampering and unauthoriz...

Page 7: ...of the unit When preparing to move the unit always determine the center of gravity see Table 3 and Figure 1 of the unit in order to equally distribute the weight Slings connected to the compressor end...

Page 8: ...to compressor replacement repairing refrigerant leaks replacing refrigerant components such as filter drier pressure switch metering device or coil Units are shipped with compressor mountings which ar...

Page 9: ...3 60 1 1 2 4 2 9 63 5 70 575 3 60 4 9 0 14 78 575 3 60 1 1 2 4 2 2 47 1 50 YD480 208 230 3 60 4 30 1 47 225 208 230 3 60 1 1 2 4 5 8 151 1 175 460 3 60 4 16 7 26 114 460 3 60 1 1 2 4 2 9 82 6 90 575 3...

Page 10: ...emperatures must also be insulated Never solder suction and liquid lines together They can be taped together for convenience and support purposes but they must be completely insulated from each other...

Page 11: ...ctions of the main lines Connect the main liquid line to the liquid line connection on the evaporator unit while maintaining a flow of nitrogen Make the suction line connection at the evaporator and r...

Page 12: ...Line Solenoid Wiring NOTE For applications on airhandlers evaporator DX coils other than ND360 600 certified matchups liquid line solenoids may be required for proper operation and refrigerant system...

Page 13: ...On non ND models isolation relays must be installed to avoid overloading on 75 VA transformer on condensing unit Non ND units may not include any or all of the components required to wire the unit Use...

Page 14: ...4 Johnson Controls Unitary Products Figure 6 YD Unit Dimensions Table 6 Unit Dimensions Inches MODEL A B C D E F G H YD360 128 5 88 5 37 5 41 8 40 0 46 1 37 1 23 6 YD480 128 5 88 5 57 7 41 8 40 0 46 1...

Page 15: ...183 2 313 88 140 22 358 20 858 19 358 37 518 12 878 9 628 5012886 YIM B 0517 Johnson Controls Unitary Products 15 Figure 7 30 Ton Power And Control Wiring Connections Figure 8 40 50 Ton Power And Cont...

Page 16: ...NTRY SIZE SUCTION LINE SYS 1 1 5 8 OD LIQUID LINE SYS 1 7 8 OD SUCTION LINE SYS 2 1 5 8 OD LIQUID LINE SYS 2 7 8 OD POWER WIRING KNOCKOUT SEE TABLE 8 CONTROL WIRING 7 8 HOLE Table 8 Electrical Power K...

Page 17: ...ent clearances been provided 2 Has all foreign matter been removed from the interior of the unit tools construction or shipping materials etc 3 Have the condenser fans been rotated manually to check f...

Page 18: ...minute If it fails to close the unit will shut down the associated compressor and begin an ASCD If the call for cool is still present at the end of the anti short cycle time delaying the control boar...

Page 19: ...of System 2 When the LPS of UCB 2 falls below its cut out point the PR2 relay brings on the 3LLS Solenoid allowing refrigerant in system 2 to return flow to the compressor for normal mechanical coolin...

Page 20: ...enance consists of changing or cleaning filters and general cleaning of the outdoor coil MOTORS Outdoor fan motors are permanently lubricated and require no maintenance OUTDOOR COIL Dirt should not be...

Page 21: ...cursor is on the top Status line hit the ENTER button This action steps the LCD display into the status mode Hit ENTER to view the status menu Press Enter Step 2 Scroll down to DVent Mode This is the...

Page 22: ...CANCEL JOY C PWR 7 7 77 Clg Engaged LeadLag Engaged Press Enter Joy Stick Down 2 Step 6 By toggling down twice the screen reaches the ClgOcc SP screen or Cooling Occupied Set Point ENTER CANCEL JOY C...

Page 23: ...mostat connection strip C and indoor blower VFD pin C 24V 24 VAC 75 VA transformer hot Powers the UCB microprocessor connects through circuit trace to the SD 24 terminal SD 24 24 VAC hot out for facto...

Page 24: ...hing in series Unit wiring harness jumper plug for factory shutdown accessories must be removed if the switching of field added external accessories for unit shutdown are wired between thermo stat con...

Page 25: ...ut from 10K 77 F Type III negative temperature coefficient thermistor Input required for 2 compressor heat pump units not required for 2 compressor A C units not active for 1 compressor units 3 625 VD...

Page 26: ...no input within 5 minutes from initiation of H1 output initiates an Ignition Failure alarm input for longer than 5 minutes without H1 output initiates a Gas Valve Mis wire alarm Pin Cooling and fan o...

Page 27: ...put is needed input must be present to allow FAN output and unit operation One FAN OVR trip lasting longer than 5 minutes or three FAN OVR trips in a two hour period cause a Fan Overload Lockout and u...

Page 28: ...munication circuit COM Common for the FC Field Connected BUS BACnet MSTP communication circuit Negative of the VDC FC bus BACnet MSTP communication circuit SHLD Shield for the FC Field Connected BUS B...

Page 29: ...with the TXV s left to the factory setting If the TXV s have been adjusted in the field the charging chart may no longer apply Outdoor Air Entering Condenser F 300 350 400 450 500 550 600 120 130 140...

Page 30: ...scharge Pressure psi Suction Pressure psi Charging Curves 50 Ton 115 105 95 85 65 1 Make sure that all condenser fans are running when charging 2 This chart is applicable to unit with the TXV s left t...

Page 31: ...5012886 YIM B 0517 Johnson Controls Unitary Products 31 Typical Wiring Diagrams Figure 17 Typical 208 230 Volt YD360 480 600 Condensing Unit Wiring Diagram...

Page 32: ...5012886 YIM B 0517 32 Johnson Controls Unitary Products Typical Wiring Diagrams Figure 18 Typical 460 575 Volt YD360 480 600 Condensing Unit Wiring Diagram...

Page 33: ...ocedures are followed and checks are made at initial start up This confidence is supported by the 30 day dealer protection coverage portion of our standard warranty policy which states that Johnson Co...

Page 34: ...he equipment If the system is a VAV system the CFM will be the airflow when the remote VAV boxes are in the full open position and the frequency drive is operating at 60 HZ Do not proceed with the equ...

Page 35: ...ystem 2 Is Condenser below Evaporator Yes No Yes No Total Line Length end to end _______ Ft _______ Ft Vertical Lift in Ft _______ Ft _______ Ft Vertical Fall in Ft _______ Ft _______ Ft Number of Elb...

Page 36: ...t or change required to obtain the correct airflow Was it necessary to increase of decrease the airflow to meet the design conditions If the motor pulley size was changed measure the outside diameters...

Page 37: ...hird if equipped Fourth if equipped Heat Pump 1st Stage Outside air temperature ________________ db F ________________ wb F ________________ RH Return Air Temperature ________________ db F ___________...

Page 38: ..._______________________________ ________________________________________________________________________________________________________ _______________________________________________________________...

Reviews: