Locks and jumper between the WHITE and YELLOW
wires of the UCB’s Mate-N-Lock plug.
13. The UCB can be programmed to lock out compressor
operation during free cooling and in low ambient condi-
tions. These options are not enabled by default. They
can be checked by local distributors.
For units with factory installed economizers, the UCB is
programmed to lock out compressor operation when the
LAS set point is reached.
For units without factory installed or with field installed
economizers, the UCB allows compressor operation all
the time. This programming can be checked or changed
by the local distributor.
14. If none of the above corrected the error, test the integrity
of the UCB. Disconnect the C1 terminal wire and jumper
it to the Y1 terminal. DO NOT jump the Y1 to C1 termi-
nals. If the compressor engages, the UCB has faulted.
15. If none of the above correct the error, replace the UCB.