7 - Refrigerant piping connections

Make  piping  runs  as  short  as  possible  and  avoid  all
unnecessary changes in direction or elevation.

To  prevent  heat  loss,  the  two  lines  must  be  insulated
s e p a r a t e l y.

Use an appropriate bending tool to form curves and avoid
flattening the refrigerant tubes.

Fix piping with pipe clamps and make sure that any eventual
pipe vibrations cannot be transmitted to the building structure.

Use refrigeration quality piping only with an operating pres-
sure rating of at least 30 bars.  N e v e r use ordinary «plum-
bing» quality  piping  :  you  MUST  use special  de-oxidised,
dehydrated, refrigerant quality copper piping.

Pipe lengths

• Maximum piping lengths

Note: Where the difference in elevation between the indoor

unit and the outdoor unit is greater than 5 metres, install
an oil trap every 5 metres.

The suction line must have a 2% gradient up to the compressor
on horizontal sections.
Where piping lengths are unusually long and include a large
number of oil traps, it may be necessary to adjust the compres-
sor oil charge.

D

L

L

• Refrigerant charge to be added per extra metre of

piping length when more than 7.5 m.

Refrigerant piping connections (FLARE connections)

To avoid alteration of unit capacities, make sure that piping
lengths and changes in elevation are kept to a strict minimum.

Before connecting the refrigerant lines, follow the procedures
below (if pre-charged connection lines are not supplied) :

- Select copper pipe diameters according to the size of unit to

be installed.

- Install the refrigeration lines, making sure that no foreign

bodies get inside the piping.

- Install the flare connectors and flare the ends of the pipes.

- Evacuate the piping. This operation, which should last at

least 15 minutes or even longer if there are large piping
lengths and changes in elevation, should be followed by a
leak test. To this effect, when the piping has been evacua-
ted, close the pressure guage tap, note the value on the
guage, then wait for 15 minutes. If the needle moves, there
is a leak in the system. Make the necessary adjustments or
repairs and repeat this procedure until the needle no longer
m o v e s .

- Open the service valves and top up the refrigerant charge if

n e c e s s a r y.

Minimum thickness 6 mm

Insulation

Heat pump

Heat pump
(discharge)

Gas

Cooling

(suction)

Liquid

Cooling

Heat pump

Heat pump
(discharge)

Gas

Cooling

(suction)

Liquid

Cooling

Gas line

Liquid line

R22

Indoor unit

Outdoor unit

Unit size

12

18

25

D (m)

15

15

22

L (m)

18

18

25

H (m)

12

12

20

Unit size

12

18

25

g/m

15

40

40

High pressure

Manifold

Gas valve

Liquid valve

Pressure

tap

Low pressure

<--

Summary of Contents for MOC12

Page 1: ...Cassette MINISPLIT MKC MKH 12 18 24 Infrared remote control MOC MOH YORK...

Page 2: ...ning Dismantling and Disposal 1 Safety Installation and maintenance of this air conditioning system should only be carried out by trained and qualified personnel Regular maintenance operations such as...

Page 3: ...0 C Indoor MKC MKH Models unit 12S 18S 24S Outdoor MOC MOH unit 12 18 25 Cooling Btu h 12 000 18 000 24 000 kW 3 5 5 3 7 Capacities Heating Btu h 12 500 18 500 25 100 kW 3 6 5 4 7 1 Electric heating k...

Page 4: ...istics table on page 3 Outdoor unit MOC MOH 12 18 Outdoor unit MOC MOH 25 H L P Clearances required for outdoor units C B E A D 5 4 2 3 660 575 1 660 1 False ceiling 2 Condensate drainage 3 Gas line c...

Page 5: ...is way and the remote control is forced off line The tempera ture setpoint is set at 24 C both in the heating and cooling mode To revert to normal remote control operation set the selector to the NOR...

Page 6: ...ulated to prevent dro plets of condensation from dripping on the false ceiling Connect the drainage tube int 12 mm coming from the pump to a P V C drainage line 32 mm mini It is advisable to install a...

Page 7: ...oid alteration of unit capacities make sure that piping lengths and changes in elevation are kept to a strict minimum Before connecting the refrigerant lines follow the procedures below if pre charged...

Page 8: ...s Fit the casing and grille together using the screws fig 5 ref b Put the filter fig 6 and the return air grille fig 6 7 back in place 8 Wiring diagram 9 Front panel installation 1 N E 2 1 N E A 2 Pow...

Page 9: ...g 6 a a a a A Cooling operation summer Coanda effect Heating operation winter Detail A Depending on the configuration of the room to be air conditioned one or two of the deflectors may be left closed...

Page 10: ...y can be determined by using correction fac tors C1 C2 and C3 Given cooling capacity Cooling capacity at standard rating conditions x C1 x C2 x C3 C1 Capacity correction factor for temperature C2 Capa...

Page 11: ...12 18 24 MKH 12 18 24 SERIAL NUMBER IS IN COMPLIANCE WITH THE REQUIREMENTS OF APPLICABLE EEC DIRECTIVES 89 392 EC 89 336 CEE NATIONAL STANDARDS AND TECHNICAL SPECIFICATIONS ISO 9001 Pr EN378 AND IN AC...

Page 12: ...very unit This refrigerant may then be re used if appropriate or returned to the manufacturer for disposal Under NO circumstances should refrigerant be vented to atmosphere Where appropriate drain the...

Reviews: