background image

® 

550.38-N1Y

6

Unitary Products Group

4.

The vapor line must be insulated with a minimum of 1/2"
foam rubber insulation (Arm-A-Flex or equivalent). Liquid
lines that will be exposed to direct sunlight and/or high
temperatures must also be insulated.

Tape and suspend the refrigerant lines as shown. DO NOT
allow metal-to metal contact. See Figure  4.

5.

Use PVC piping as a conduit for all underground installa-
tions as shown in Figure  5. Buried lines should be kept
as short as possible to minimize the build up of liquid
refrigerant in the vapor line during long periods of shut-
down.

6.

Pack fiber glass insulation and a sealing material such
as permagum around refrigerant lines where they pen-
etrate a wall to reduce vibration and to retain some
flexibility.

7.

See Form 690.01-AD1V for additional piping information.

PRECAUTIONS DURING BRAZING OF LINES

All outdoor unit and evaporator coil connections are copper-
to-copper and should be brazed with a phosphorous-copper
alloy material such as Silfos-5 or equivalent. DO NOT use
soft solder.

The outdoor units have re-usable service valves on both the
liquid and vapor connections. The total system refrigerant
charge is retained within the outdoor unit during shipping and
installation. The re-usable service valves are provided to
evacuate and charge per this instruction.

Serious service problems can be avoided by taking adequate
precautions to assure an internally clean and dry system.

PRECAUTIONS DURING BRAZING ANGLE VALVE 

Precautions should be taken to prevent heat damage to
angle valve by wrapping a wet rag around it as shown in Fig-
ure  6. Also, protect all painted surfaces and insulation during
brazing. After brazing - cool joint with wet rag.

Connect the refrigerant lines using the following procedure:.  

1.

Remove the cap and Schrader core from both the liquid
and vapor angle valve service ports at the outdoor unit.
Connect low pressure nitrogen to the liquid line service
port.

2.

Braze the liquid line to the liquid valve at the outdoor
unit. Be sure to wrap the valve body with a wet rag. Allow
the nitrogen to continue flowing.

 FIGURE 4 :   TUBING HANGER

 FIGURE 5 :   UNDERGROUND INSTALLATION

L I QUI D
L I NE

TAPE

INSULATED VAPOR LINE

CORRECT

INCORRECT

SHEET METAL HANGER

TO INDOOR COIL

TO OUTDOOR UNIT

LIQUID LINE

CAP

PVC

CONDUIT

INSULATED

VAPOR LINE

 Dry nitrogen should always be supplied through the
tubing while it is being brazed, because the tempera-
ture required is high enough to cause oxidation of the
copper unless an inert atmosphere is provided. The
flow of dry nitrogen should continue until the joint has
cooled. Always use a pressure regulator and safety
valve to insure that only low pressure dry nitrogen is
introduced into the tubing. Only a small flow is neces-
sary to displace air and prevent oxidation.

This is not a backseating valve. The service access
port has a valve core. Opening or closing valve does
not close service access port.

 If the valve stem is backed out past the retaining ring,
the O-ring can be damaged causing leakage or sys-
tem pressure could force the valve stem out of the
valve body possibly causing personal injury. In the
event the retaining ring is missing, do not attempt to
open the valve.

Summary of Contents for H*DB012 - 76

Page 1: ...8 FIELD CONNECTIONS POWER WIRING 8 FIELD CONNECTIONS CONTROL WIRING 8 SYSTEM CHARGE 8 MEASUREMENT METHOD 9 SUPERHEAT CHARGING METHOD 9 SYSTEM START UP 9 ENERGIZE CRANKCASE HEATER 9 SYSTEM CONTROLLER H...

Page 2: ...ler or furnace and other accessories Read all instructions before installing the unit Installer should pay particular attention to the words NOTE CAUTION and WARNING NOTES are intended to clarify or m...

Page 3: ...t is placed directly under windows of certain rooms bed rooms study etc ROOF INSTALLATION When installing units on a roof the structure must be capable of supporting the total weight of the unit inclu...

Page 4: ...ates from entering the coil If the orifice cannot be replaced and the coil resealed within 2 minutes then it should be temporarily closed to air using masking tape short term delay or plugging cap pin...

Page 5: ...rtical bulb installations the bulb should be positioned with the bulb tail at the top so that the bulb acts as a reservoir c Bulb should be insulated using thermal insulation provided to protect it fr...

Page 6: ...be taken to prevent heat damage to angle valve by wrapping a wet rag around it as shown in Fig ure 6 Also protect all painted surfaces and insulation during brazing After brazing cool joint with wet...

Page 7: ...unger cap and with an allen wrench back out counter clockwise until valve stem just touches retaining ring Release the refrigerant charge into the system See PRECAUTIONS DURING BRAZING ANGLE VALVE on...

Page 8: ...cal box cover 3 All field wiring to be in accordance with national electrical codes NEC and or local city codes NOTE A Start Assist Kit is available and recommended for long line set applications or i...

Page 9: ...er and the outdoor dry bulb DB temperature using a thermometer 3 Measure and record the suction pressure at the suction service valve port 4 Using Table 1 on page 12 note the superheat value cor respo...

Page 10: ...S T B E W E A T H E R P R O O F 2 4 V O L T C O N T R O L W I R I N G M i n i m u m 1 8 G A W i r e N E C C l a s s 2 GROUND LUG C Y R G W W G R Y C O N T A C T O R T E R M I N A L S F U R N A C E O...

Page 11: ...6 0 R E D G R O U N D S C R E W A L L F I E L D W I R I N G T O B E I N A C C O R D A N C E W I T H N A T I O N A L E L E C T R I C A L C O D E N E C A N D O R L O C A L C O D E S L 1 L 2 L 3 A L L O...

Page 12: ...1 63 63 67 69 71 73 75 77 76 0 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 79 2 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 82 4 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81...

Page 13: ...t the migration of refrigerant to the compressor during the OFF cycle The heater is energized only when the unit is not running If the main switch is disconnected for long periods of shut down do not...

Page 14: ...550 38 N1Y 14 Unitary Products Group NOTES...

Page 15: ...550 38 N1Y Unitary Products Group 15 NOTES...

Page 16: ...nditioning Unitary Products Group 5005 York Drive Norman Oklahoma 73069 Subject to change without notice Printed in U S A Copyright by Unitary Products Group 1999 All rights reserved Supersedes 550 38...

Reviews: