After holding charge is completely discharged, loosen
and remove the liquid line fitting from the orifice distributor
assembly. Note that the fitting has right hand threads.

3.

Remove the orifice from the distributor body using a
small diameter wire or paper clip. Orifice  is  not  used
when the TXV assembly is installed.

4.

After orifice is removed, install the thermal expansion
valve to the orifice distributor assembly with supplied fit-
tings. Hand tighten and turn an additional 1/8 turn to
seal. Do not overtighten fittings.

5.

Reinstall the liquid line to the top of the thermal expan-
sion valve. Hand modify the liquid line to align with cas-
ing opening.

6.

Install the TXV equalizer line into the vapor line as follows:

a.

Select a location on the vapor line for insertion of the
equalizer line which will not interfere with TXV bulb
placement.

b.

Use an awl to punch through the suction tube and
insert the awl to a depth to achieve a 1/8 inch diam-
eter hole.

7.

Install TXV equalizer line in 1/8 hole previously made in
vapor line. Equalizer line can be bottomed out in vapor
line as end of equalizer line is cut on 45 degrees angle to
prevent blockage. Braze equalizer line making sure that
tube opening is not brazed closed.

All connections to be brazed are copper-to-copper and
should be brazed with a phosphorous-copper alloy material
such as Silfos-5 or equivalent. DO NOT use soft solder.

Install the TXV bulb to the vapor line near the equalizer line,
using the two bulb clamps furnished with the TXV assembly.

Ensure the bulb is making maximum contact. Refer to TXV
installation instruction for view of bulb location.

a.

Bulb should be installed on a horizontal run of the
vapor line if possible. On lines under 7/8" OD the
bulb may be installed on top of the line. With 7/8"
OD and over, the bulb should be installed at the
position of about 4 or 8 o'clock.

b.

If bulb installation is made on a vertical run, the bulb
should be located at least 16 inches from any bend,
and on the tubing sides opposite the plane of the
bend. On vertical bulb installations, the bulb should
be positioned with the bulb tail at the top, so that the
bulb acts as a reservoir.

c.

Bulb should be insulated using thermal insulation
provided to protect it from the effect of the surround-
ing ambient temperature.

PIPING CONNECTIONS

The outdoor condensing unit may be connected to the indoor
evaporator coil using field supplied refrigerant grade copper
tubing that is internally clean and dry. Units should be
installed only with the tubing sizes for approved system com-
binations as specified in Tabular Data Sheet. The charge
given is applicable for total tubing lengths up to 15 feet. See
Application Data Form 690.01-AD1V for installing tubing of
longer lengths and elevation differences.

NOTE:  Using a larger than specified line size could result in oil

return problems. Using too small a line will result in loss
of capacity and other problems caused by insufficient
refrigerant flow. Slope horizontal vapor lines at least 1"
every 20 feet toward the outdoor unit to facilitate proper
oil return.

PRECAUTIONS DURING LINE INSTALLATION

1.

Install the lines with as few bends as possible. Care must
be taken not to damage the couplings or kink the tubing.
Use clean hard drawn copper tubing where no apprecia-
ble amount of bending around obstruction is necessary.
If soft copper must be used, care must be taken to avoid
sharp bends which may cause a restriction.

2.

The lines should be installed so that they will not obstruct
service access to the coil, air handling system or filter.

3.

Care must also be taken to isolate the refrigerant lines to
minimize noise transmission from the equipment to the
structure.

The evaporator coil is under 30 psig pressure.

 Dry nitrogen should always be supplied through the
tubing while it is being brazed, because the tempera-
ture required is high enough to cause oxidation of the
copper unless an inert atmosphere is provided. The
flow of dry nitrogen should continue until the joint has
cooled. Always use a pressure regulator and safety
valve to insure that only low pressure dry nitrogen is
introduced into the tubing. Only a small flow is neces-
sary to displace air and prevent oxidation.

 In all cases, mount the TXV bulb after vapor line is
brazed and has had sufficient time to cool.

Summary of Contents for H*DB012 - 76

Page 1: ...8 FIELD CONNECTIONS POWER WIRING 8 FIELD CONNECTIONS CONTROL WIRING 8 SYSTEM CHARGE 8 MEASUREMENT METHOD 9 SUPERHEAT CHARGING METHOD 9 SYSTEM START UP 9 ENERGIZE CRANKCASE HEATER 9 SYSTEM CONTROLLER H...

Page 2: ...ler or furnace and other accessories Read all instructions before installing the unit Installer should pay particular attention to the words NOTE CAUTION and WARNING NOTES are intended to clarify or m...

Page 3: ...t is placed directly under windows of certain rooms bed rooms study etc ROOF INSTALLATION When installing units on a roof the structure must be capable of supporting the total weight of the unit inclu...

Page 4: ...ates from entering the coil If the orifice cannot be replaced and the coil resealed within 2 minutes then it should be temporarily closed to air using masking tape short term delay or plugging cap pin...

Page 5: ...rtical bulb installations the bulb should be positioned with the bulb tail at the top so that the bulb acts as a reservoir c Bulb should be insulated using thermal insulation provided to protect it fr...

Page 6: ...be taken to prevent heat damage to angle valve by wrapping a wet rag around it as shown in Fig ure 6 Also protect all painted surfaces and insulation during brazing After brazing cool joint with wet...

Page 7: ...unger cap and with an allen wrench back out counter clockwise until valve stem just touches retaining ring Release the refrigerant charge into the system See PRECAUTIONS DURING BRAZING ANGLE VALVE on...

Page 8: ...cal box cover 3 All field wiring to be in accordance with national electrical codes NEC and or local city codes NOTE A Start Assist Kit is available and recommended for long line set applications or i...

Page 9: ...er and the outdoor dry bulb DB temperature using a thermometer 3 Measure and record the suction pressure at the suction service valve port 4 Using Table 1 on page 12 note the superheat value cor respo...

Page 10: ...S T B E W E A T H E R P R O O F 2 4 V O L T C O N T R O L W I R I N G M i n i m u m 1 8 G A W i r e N E C C l a s s 2 GROUND LUG C Y R G W W G R Y C O N T A C T O R T E R M I N A L S F U R N A C E O...

Page 11: ...6 0 R E D G R O U N D S C R E W A L L F I E L D W I R I N G T O B E I N A C C O R D A N C E W I T H N A T I O N A L E L E C T R I C A L C O D E N E C A N D O R L O C A L C O D E S L 1 L 2 L 3 A L L O...

Page 12: ...1 63 63 67 69 71 73 75 77 76 0 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 79 2 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 82 4 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81...

Page 13: ...t the migration of refrigerant to the compressor during the OFF cycle The heater is energized only when the unit is not running If the main switch is disconnected for long periods of shut down do not...

Page 14: ...550 38 N1Y 14 Unitary Products Group NOTES...

Page 15: ...550 38 N1Y Unitary Products Group 15 NOTES...

Page 16: ...nditioning Unitary Products Group 5005 York Drive Norman Oklahoma 73069 Subject to change without notice Printed in U S A Copyright by Unitary Products Group 1999 All rights reserved Supersedes 550 38...

Reviews: