LOCATION
Use the following guidelines to select a suitable location for
these units.
1.
Unit is designed for outdoor installation only.
2.
Condenser must have an unlimited supply of air. Where
a choice of location is possible, position unit on either
north or east side of building.
3.
For ground level installation, a level pad or slab should
be used. The thickness and size of the pad or slab used
should meet local codes and unit weight. Do not tie the
slab to the building foundation.
4.
For roof top installation, be sure the structure will support
the weight of the unit plus any field installed components.
Unit must be installed on a level roof curb or appropriate
angle iron frame providing adequate support under the
compressor/condenser section.
5.
Maintain level tolerance of unit to 1/8" maximum.
CLEARANCES
All units require certain clearances for proper operation and
service. Refer to Table 10 for the clearances required for
combustion, construction, servicing and proper unit opera-
tion.
RIGGING OR HANDLING
Care must be exercised when moving the unit. Do not
remove any packaging until the unit is near the place of
installation. Rig unit with slings placed under the unit.
Spreader bars of sufficient length should be used across the
top of the unit.
Units may also be moved or lifted with a fork-lift. Slotted
openings in the skid are provided for this purpose. Forks
must pass completely through the base.
Refer to Table 2 for unit weights and to Figure 1 for approxi-
mate center of gravity.
Excessive exposure of this furnace to contami-
nated combustion air may result in equipment
damage or personal injury. Typical contaminates
include: permanent wave solution, chlorinated
washes and cleaners, chlorine based swimming
pool chemicals, water softening chemicals, carbon
tetrachloride, halogen type refrigerants, cleaning
solvents (e.g. perchloroethylene), printing inks,
paint removers, varnishes, hydrochloric acid,
cements and glues, antistatic fabric softeners for
clothes dryers, masonry acid washing materials.
Do not permit overhanging structures or shrubs to
obstruct the condenser air discharge, combustion
air inlet or vent outlet.
Before lifting a unit, make sure that its weight is
distributed equally on the cables so that it will lift
evenly.
TABLE 2: UNIT WEIGHTS AND CENTER OF
GRAVITY
UNIT
SIZE
SHIPPING
WEIGHT
(
LBS
.)
OPERATING
WEIGHT
(
LBS
.)
CORNER WEIGHTS
(
LOCATION
,
LBS
.)
“A”
“B”
“C”
“D”
024
365
360
91
88
89
92
030
395
390
98
95
96
99
036
400
395
100
96
98
101
042
470
465
131
129
101
103
048
475
470
133
130
102
104
060
485
480
136
133
105
107
FIGURE 1 - UNIT CENTER OF GRAVITY
"A"
"B"
"C"
"D"
49-1/8
25
25
47-1/4
FRONT
OF
UNIT
CENTER OF
GRAVITY
Summary of Contents for DYZ 024
Page 20: ...66435 BIM B 1004 20 Unitary Products Group FIGURE 13 TYPICAL WIRING DIAGRAM DYZ 208 230 1 60...
Page 21: ...66435 BIM B 1004 Unitary Products Group 21 FIGURE 14 TYPICAL WIRING DIAGRAM DYZ 208 230 3 60...
Page 22: ...66435 BIM B 1004 22 Unitary Products Group FIGURE 15 TYPICAL WIRING DIAGRAM DYZ 460 3 60...