5-1
IM 01B04J01-02E
Setting
1
2
3
App
1
2
3
5
6
7
8
4
Setting
Items to Confirm before Start of Operation
Before you start operation, inspect and confirm the following items:
(1) Draw out the internal unit from the rack case, and make sure that the specified fuses are
properly mounted in the fuse holders at the rear of the internal unit.
(2) When inserting the internal unit into the rack case, firmly connect the multi-pin connectors
for connecting the internal unit and the case.
(3) Make sure that power plugs are properly connected to the power outlet.
(4) Make sure that external wiring to the terminal block is properly connected.
The STED converters are made ready for operation by simply turning on the power once the
installation and wiring are completed. The instrument does not require parameter settings
and the like if there is no change in the specifications at order.
Chapter 5 Setting
Summary of Contents for YewSeries 80 STED Style S
Page 2: ......
Page 4: ...Blank...
Page 10: ...Blank...
Page 14: ...Blank...
Page 30: ...Blank...
Page 40: ...Blank...
Page 46: ...Blank...