General Instruction Manual
Commissioning
IM 01U10B00-00EN-R, 3rd edition, 2018-07-09
67 / 90
8 Commissioning
1. Activate external power switch.
2. Perform check of piping installation.
3. Check flow meter for device errors, warnings or alarms,
see chapter on
Troubleshooting [
}
80]
.
4. Configure the transmitter, and perform autozero,
see chapter on
Default settings [
}
72]
.
ð
Flow meter is ready for operation.