2. Transportation, Storage and Installation
2-6
TI 32P01J10-01EN
2.5 Installation
Before installation, be sure that anchor bolts, pedestals, and cable holes are provided
according to the customer’s system configuration plans. Check that the positions of
holes on the floor fit the anchor bolt holes in the channel base of each piece of equipment.
Nov. 27, 2015-00