12
IM 04L45B02-02EN
DX2000T Workflow
When using the DX for the first time, carry out the following procedure.
Installation
Wiring
Power ON
Environmental
Settings
Functional
Settings
Measurement
Data
Management
Install the DX.
Page 62 and subsequent pages
Connect input/output wires to the terminals and connectors on the
rear panel, and connect the power cord.
Page 65 and subsequent pages
Turn the power ON.
Page 13
Set the date/time, load the CF card, and so on.
Page 18 and 24
Set measurement functions.
Page 19 and subsequent pages, page 28 and subsequent pages
Start the measurement. Perform operations such as switching the
screen and writing messages. Save the measured data.
Page 39 and subsequent pages
Check and manage the measured data.
Use the accompanying software program, DAQSTANDARD, to display
the measured data and convert the measured data to Excel, Lotus, and
ASCII formats.
Page 60
DAQSTANDARD Viewer User’s manual
(IM 04L41B01-63EN)
On a DX with advanced security (/AS1 option), carry out the following procedure after
turning the DX on.
User
Registration
Environmental
Settings
Functional
Settings
Measurement
Data
Management
CF Card
Insertion
Register the users who will operate the DX.
Advanced Security Function (/AS1 option) User’s Manual
(IM04L41B01-05EN)
Check the measured data, and attach approval information
to the measured data file.
Advanced Security Function (/AS1 option) User’s Manual
(IM04L41B01-05EN)
You can also attach approval information to the measured data file
by using the accompanying software program, DAQSTANDARD.
DAQSTANDARD Viewer User’s Manual
(IM 04L41B01-63EN)
Set the date/time.
Page 18
Insert a CF card into the DX.
Page 24
Set measurement functions.
Page 19 and subsequent pages, page 28 and subsequent pages
Start the measurement. Perform operations such as switching
the screen and writing messages. Save the measured data.
Page 39 and subsequent pages