(c) Insert all modules in line with the guide of the
NC rack and tighten mounting screws (NC rack).
(d)
insert
the cables into the original positions.
(3)
Checking Functions After Replacement
(a)
Check that+ 5V, 12V, and + 24V outputs are not
shorted due to overloading.
(b) Apply the first power and second power again and
check that no alarm occurs.
(SMON) and
(FILE: optional) boards are
provided with CMOS RAM (programs, parameters and
offset data) and with backup by super capacitor.
Therefore,
installation must be completed within
16 hours after removal of the boards.
183
Summary of Contents for YASNAC i80
Page 3: ...YASNAC i80 CNC SYSTEM FOR MACHINE TOOLS MAINTENANCE MANUAL v YASUAW14 ...
Page 26: ...1 2 COMPONENTS Cent d 16 14 ACGC Operation Panel Model JZNC IOP1l E u v d 1 2 0 a L ...
Page 30: ... I A om o amvr _ fi___ n ___ __n__n WI c ___________ ...
Page 41: ... Model JANCD FC260 I Ha Approx mass 0 34 kg 1 ...
Page 45: ... rl v JANCD Fc050 1 B r 1 2 q 11 ...
Page 206: ...196 ...