![YASKAWA MH5S II Operating And Maintenance Manual Download Page 25](http://html1.mh-extra.com/html/yaskawa/mh5s-ii/mh5s-ii_operating-and-maintenance-manual_3313836025.webp)
Wiring
5
-
25
5.2.2
Connection of the robot controller
Attach the robot cables in the following order.
1. Connect the encoder cable (1BC) X11 at connection X11 to the robot controller.
2. Connect the power cable (2BC) X21 at connection X21 to the robot controller.
Make sure that you hear the locking clips snap into place (clicking sound).
Fig. 5-5: Connection of the robot controller
X 11
X 21
X -1
X -2
Summary of Contents for MH5S II
Page 1: ...ROBOTICS MH5S II YR MH0005S J12 Operating and Maintenance Manual...
Page 19: ...Installation 4 19 Fig 4 2 Base plate 3 160 30 4x 80 350 350 290 290 160 18 50 4x 20 24 4...
Page 32: ...Technical data 6 32 Robot speed degrees second deg s Definitions Description...
Page 47: ...Maintenance and inspection 9 47 Fig 9 2 Inspection intervals 5 5 5 7 1 1 1 1 1 6 1 3...
Page 73: ...Parts lists 11 73 Tab 11 1 S axis drive 1049 HW0414484 1 Gasket 1 No DWG no Designation Piece...
Page 82: ...YASKAWA Headquarter...