
YASKAWA
TOEPC7106171GA FP605 Drive Installation & Primary Operation
35
5.
Hold the terminal block bolts with the box wrench and tighten the terminal block nuts to a correct torque.
Figure 7.11 Tighten the Main Switch Terminal Block Nuts
6.
Install the Main Switch front cover and the keypad to their initial positions.
Note:
• For knock-out holes that you do not use for control circuit wiring, install the included rubber waterproofing grommets. For knock-
out holes that you do use for control circuit wiring, install the correct conduit to keep the protection level.
• The knock-out holes for main circuit wiring do not have rubber grommets. Install the correct conduit to keep the IP55/UL Type 12
protection level.
A - Rubber grommets