3.
INSTALLATION
Delivery
Check for Damage: Yaskawa Solectria Solar thoroughly inspects and rigorously tests all rack-mounted
components in the ACS-500 AC-Coupled Storage System before shipment. On rare occasions damage
may occur during shipping. Upon receipt of the ACS-500 system, please do the following:
Inspect all ACS-500 system as received, pre-mounted and pre-wired on the rack.
If damage is observed, take digital photos to document the damage and immediately report the
damage to the shipping company.
If the recipient has any question about the potential shipping damage, contact Yaskawa Solectria
Solar (see Section 6 for contact information).
If Yaskawa Solectria Solar determines that any component of the ACS-500 needs to be returned,
obtain an RMA number from Yaskawa Solectria Solar and instructions for returning the unit.
Placement and Anchoring
To anchor the ACS-500 to a concrete pad, secure anchor bolts at the four anchoring provisions located
at the ends of the horizontal support bars. These anchor points have an internal diameter opening of 1”
(see Figure 2-2 ACS-500 System Components)
.
Failure to secure the rack with anchoring bolts will render
the warranty of the ACS-500 void.
Please refer to the following installation diagram for anchoring point locations and customer conduit
locations:
Figure 3-1: Installation Diagram showing Areas Available (shaded) for Conduit