
32
support@yardistrystructures.com
Measure 40" to top
of gusset from
ground. Fasten with
#8 x2-1/4 WS
Step 14: Shelf Assembly
Part 1
A:
Under each (797) Side Beam, measure 40” (101.6 cm) up from the bottom of each Post Assembly along the
sides facing each other, then place one (793) Shelf Gusset on each face so the tops are at the 40” (101.6 cm)
mark. The end facing the inside the Pavilion to be flush to the Post Assembly. Make sure (793) Shelf Gussets
are level then attach with five #8 x 2-1/4” Wood Screws. (F14.1 and F14.2)
F14.1
F14.2
Hardware
20 x #8 x 2-1/4” Wood Screw
Wood Parts
4 x (793) Shelf Gusset
Post
Assembly
(793) Shelf
Gusset
(793) Shelf
Gusset
(793) Shelf
Gusset
Post
Assembly
Post
Assembly
#8 x 2-1/4”
Wood Screws
(5 per gusset)
Flush
Flush
40”
(101.6 cm)