background image

Assembly Manual

Hyperion Vinyl Playset

Summary of Contents for Hyperion

Page 1: ...Assembly Manual Hyperion Vinyl Playset...

Page 2: ...he satisfaction and enjoyment of this hideout is only a few minutes away Have fun You have purchased a product that consists of bulky pieces With your purchase you assume full responsibility to have t...

Page 3: ...Parts List note numbers on these six pieces...

Page 4: ...illed hole pattern Align pre drilled holes on 4x4 with pre drilled holes on 2x6 Using 6 7 8 bolts begin fastening 2x6 s to tower 4x4 Thread acorn nut onto rod as you can then back off several turns Be...

Page 5: ...on as shown Very important to note drilling patterns on 4x4 s Fasten using 6 7 8 bolts Finger tighten acorn nuts at this point Place 4x4x108 labeled 3 in this position Notice the pre drilled hole patt...

Page 6: ...e flat washer between acorn nut and vinyl Bolts should be flush with outside of 2x6 before putting on the bracket Repeat previous step in this corner using 4x4x108 labeled 4 Place 4x4x128 labeled 5 in...

Page 7: ...as shown Also notice the pre drilled hole pattern on this 2x6 You can also place 6 7 8 bolts with an acorn nut and washer on one side in the pre drilled holes as shown This will be the placement of t...

Page 8: ...at this point After four 2x6x44 s are in their proper place your set should appear like this Tighten all the acorn nuts on the framing for the 7 deck Use a 9 16 deep socket and a 9 16 open end wrench...

Page 9: ...st hanger 6WHS 21 6WHS 24 6WHS 23 6WHS 22 Identify two 2x6x50 with joist hangers attached Install one 2x6 with joist hanger then install 2x6x44 with no joist hanger Install second 2x6 with joist hange...

Page 10: ...socket and a 9 16 open end wrench Keep in mind that over tightening can damage the acorn nut You will receive two sandbox seats with your playset The can be installed at any corner using 1 1 2 screws...

Page 11: ...t step 30 on upper deck using 35 5 8 between posts Identify four 2x6x44 and begin fastening as shown Align pre drilled holes on 4x4 with pre drilled holes on 2x6 Using 6 7 8 bolts begin fastening 2x6...

Page 12: ...all nuts on lower ring Before continuing refer to print to know where all the components will be fastened to main tower Then using patterns provided fasten poly slats at the proper positions using 1...

Page 13: ...now ready to install your roof Instructions for the tarp roof assemblies can be found on pages 14 16 6WHS 38 Your main tower assembly is now complete You can now fasten rock wall if you purchased one...

Page 14: ...6WHS 1 Identify 2x4x68 for cover frame Fasten 2x4 s to 4x4 post on tower using 3 lag Space on each end should be 12 1 4 One on front of tower 6WHS 2 Tarp Roof Assembly There should also be one 2x4 at...

Page 15: ...center 6WHS 6 Then center one 2x4x30 with bracket on 2x4x68 and fasten using 1 3 4 screws 6WHS 5 Tarp Roof Assembly And a 2x4x30 with brackets should be fastened here as well 6WHS 7 Then fasten 2x4x49...

Page 16: ...cap on 2x4 support Then pull tight on opposite side and fasten 6WHS 10 Additional 2x4x16 needs to be added to support lower deck frame 6WHS 11 Your completed tarp assembly should appear like this The...

Page 17: ...am using lags provided in bearing packs Step 2 Step 1 Swing Frame Assembly If you purchased a plastic glider your next step is to install the glider bracket This bracket needs to be fastened to the op...

Page 18: ...rn nut and the metal bracket Tighten nuts Step 6 Step 5 Swing Frame Assembly With swing beam in same position attach beam strap to swing beam using two 4 7 8 bolts provided Only finger tighten at this...

Page 19: ...t appear exactly as pictured at this point Swing Frame Assembly Step 9 Step 10 Fasten corner brace to swing beam and end post Be sure end post is plumb Attach using six 1 3 4 washer head screws Push b...

Page 20: ...Be sure to place washer between acorn nut and vinyl Step 13 Step 16 Step 15 Step 14 Identify end post braces Fasten the short angle to the ground runner that was installed on previous step Use 4 18 b...

Page 21: ...appear like this after you have added your swings Now is a good time to go over the entire set and be sure all bolts and nuts are properly installed and tightened 21 The next step is to install the c...

Page 22: ...begin identify the main components one top ladder one ground runner 2x4 and two brace 2x4 s and one end ladder On opposite end fasten end ladder to top ladder using four 4 1 8 bolts Tighten using a 9...

Page 23: ...inst inside of 2x6 Pre drill 7 16 hole through hole on inside flange and through 2x6 Step 6 Climbing Set Assembly Fasten ground runner 2x4 to end ladder using two 6 1 8 bolts Tighten immediately Step...

Page 24: ...Fasten long angle to end ladder using 4 lag Pre drilling is recommended Your climbing ladder assembly is now complete Step 10 Step 9 Climbing Set Assembly 24 The next step is install any other compone...

Page 25: ...1 3 4 washer head screws 6WHS 3 6WHS 2 Fasten opposite end to tower at any desired location using four 1 3 4 washer head screws Fasten 2x6x18 1 2 to poly slats on railing using four 1 3 4 washer head...

Page 26: ...ructions Framing for peek a boo panel tornado tube tunnel express and sidewinder slides 6WHS 1 6WHS 2 Fasten with 1 3 4 screws at desired location according to the components you purchased with your s...

Page 27: ...slide and fasten slide to tower using hardware and instructions provided with slide Step 3 Then place 2x4 s at desired location on tower and fasten using 1 3 4 screws Space between vertical 2x4 s shou...

Page 28: ...l take two able bodied men 6WHS 3 6WHS 2 One person hold slide steady while other person goes up into the tower to fasten slide Fasten the slide to the upper deck using the lags provided in the hardwa...

Reviews: