![background image](http://html1.mh-extra.com/html/yard-force/m0l-4et-200/m0l-4et-200_manual_3169154054.webp)
52
ADJUSTMENT
Adjusting the length of operating bar
As shown in Fig 7
1. Unscrew the plastic sleeve, so that the middle rod
can move in/out smoothly.
2.
Depending on your requirement, lengthen or
shorten the middle rod.
3. Tighten the plastic sleeve. Before restarting your
device, make sure middle rod is locked in place
securely.
OPERATION
Charging the battery Pack
As shown in Fig 8
NOTE:
the battery pack will be fully charged after
60 minutes. Remove it from the charger after it has been
fully charged.
NOTE:
this battery pack has been shipped in a
low charge condition. It should be fully charged before
first use.
NOTE:
make sure the main voltage is the same as rating label which located on the charger.
1. Connect the charger to a power supply. The green light will be on.
2. Align the battery pack with the corresponding Receptacle on the charger, push the battery Pack
in, and let it go as far as possible.
3. Once the battery pack seated on the charger correctly. The red light will be on, meanwhile the
green light will turn off. It indicates the charging procedure is carrying out.
4. After the battery pack were fully charged, The green light will light up again, and the red Light will
extinguish.
5. To remove the battery pack, simply pull it out From charger.
To obtain the best life from the battery
Never allow the battery to completely discharge before recharging. The battery pack should be placed
on the charger whenever the battery pack is noticeably running down or the tool no longer performs a
task it previously performed.
Avoid conducting short charges. Make sure that the battery is fully charged every time by allowing the
Fig.7
Fig.8
Summary of Contents for M0L-4ET-200
Page 2: ......