15
4. Operating procedures
Preparations
Installation procedures of GB210A
(
GB210 main body + GF300 mini spray
)
(
1
)
Remove four screws, open the right side door and check or switch the suction port connection
point on the main body.
Make sure that the SPRAY DRY lamp comes ON when you turn the POWER switch ON.
(
2
)
Unpack the mini SPRAY attachment (GF300) and check for any broken glasses or missing parts.
(
3
)
Install the distributor and aluminum honeycomb assembly onto the top of the unit.
(install using three M6 x 20 hex bolts, spring washers, flat washers each)
O-ring P145
O-ring P135
Install into the groove
on the bottom surface
Hex bolts at three
positions
Aluminum honeycomb (installed from
the top of the distributor)
O-ring P16
Install into the groove on
the top of the distributor
Exploded view of
the suction port
Drawing of installation of
the suction port
Source voltage selector terminal
Clamp
O ring
Filter case
Filter
Filter cover
Clamp
Blind
O ring
Knurled screw
Summary of Contents for PULVIS MINI BED GB210B
Page 39: ...37 8 When a trouble occurs Confirmation of GB210A manual and language selection display ...
Page 40: ...38 8 When a trouble occurs Confirmation of GB210A manual and language selection display ...
Page 41: ...39 8 When a trouble occurs Confirmation of GB210B manual and language selection display ...
Page 42: ...40 8 When a trouble occurs Confirmation of GB210B manual and language selection display ...