POWR
Power unit
41
6D03F1X
3.
Install the hose joint assembly
6
and the
apron
7
.
4.
Connect the PTT switch coupler and the
shift lever
8
.
5.
Connect the cooling water hose
9
.
6.
Connect the cooling water hose
0
to the
Rectifier Regulator.
7.
Connect the PTT motor leads
A
, and
then tighten the PTT motor lead bolts to
the specified torque.
8.
Install the bracket
B
and connect the
trim sensor coupler (or connector)
C
.
9.
Install the junction box cover.
10. Connect the fuel hose
D
and oil hose
E
.
S6D05110
9
T
R
.
.
PTT motor lead bolt:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
S6D05130
C
B