SWINGARM
4-64
EAS1SL5190
INSTALLING THE SWINGARM
1. Lubricate:
• Bearing
• Collars
• Spacers
• Oil seal
• Pivot shaft
2. Install:
• Bearing “1”
• Oil seals “2”
(to the swingarm)
TIP
First install the outer and then the inner bear-
ings to a specified depth from inside.
3. Install:
• Swingarm
TIP
Install the pivot shaft from the right.
4. Install:
• Rear wheel
Refer to “REAR WHEEL” on page 4-7.
5. Adjust:
• Drive chain slack
Refer to “ADJUSTING THE DRIVE CHAIN
SLACK” on page 3-27.
Recommended lubricant
Molybdenum disulfide grease
Installed depth “a”
0–0.5 mm (0–0.02 in)
Installed depth “b”
6.5 mm (0.26 in)
Pivot shaft nut
85 Nm (8.5 m·kgf, 61 ft·lbf)
Drive chain slack
50–60 mm (1.97–2.36 in)
New
New
2
2
2
1
1
a
a
a
b
b
a
New
New
New
T
R
.
.
Summary of Contents for YZ450FF 1SL-28199-11
Page 6: ...EAS1SL5006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 38: ...CLEANING AND STORAGE 1 26...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31...
Page 72: ...CABLE ROUTING DIAGRAM 2 33 EAS1SL5066 CABLE ROUTING DIAGRAM...
Page 74: ...CABLE ROUTING DIAGRAM 2 35...
Page 76: ...CABLE ROUTING DIAGRAM 2 37...
Page 78: ...CABLE ROUTING DIAGRAM 2 39...
Page 80: ...CABLE ROUTING DIAGRAM 2 41...
Page 82: ...CABLE ROUTING DIAGRAM 2 43...
Page 122: ...ELECTRICAL SYSTEM 3 38...
Page 135: ...REAR WHEEL 4 11 1 2...
Page 192: ...CHAIN DRIVE 4 68...
Page 278: ...WATER PUMP 6 7...
Page 290: ......
Page 297: ...CHARGING SYSTEM 8 7 2 AC magneto 3 Rectifier regulator 4 Joint connector 5 Condenser...
Page 299: ...CHARGING SYSTEM 8 9...
Page 325: ...FUEL PUMP SYSTEM 8 35...
Page 326: ...ELECTRICAL COMPONENTS 8 36 EAS1SL5334 ELECTRICAL COMPONENTS EAS1SL5335 9 10 1 2 3 4 5 6 7 8...
Page 328: ...ELECTRICAL COMPONENTS 8 38 EAS1SL5336 CHECKING THE SWITCHES B Y P Sb 2 1...
Page 329: ...ELECTRICAL COMPONENTS 8 39 1 Engine stop switch 2 Neutral switch...
Page 344: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...