2-21
CABLE ROUTING DIAGRAM
F.
Fasten the neutral switch lead,
CDI magneto lead, radiator
breather hose and clutch cable
over the radiator mounting boss.
G.
Pass the radiator breather hose
in front of the radiator, on the left
of the chassis, and then be-
tween the frame and radiator
hose 4.
H.
Fasten the sub-wire harness
and engine stop switch lead to
the CDI unit bracket at the white-
taped portion of the subwire har-
ness and with the clamp ends
facing downward.
I.
Locate the clamp ends in the ar-
rowed range.
J.
Fasten the neutral switch lead
and CDI magneto lead over the
hump of the frame.
K.
Fasten the hot starter cable and
throttle cable onto the frame. Lo-
cate the clamp ends under the
hot starter cable.
Summary of Contents for YZ250F X 2008
Page 2: ......
Page 3: ...YZ250F X 5XC 28199 34 E0 2008 OWNER S SERVICE MANUAL ...
Page 4: ......
Page 59: ...3 13 ENGINE INTAKE EXHAUST ...
Page 110: ...4 41 OIL PUMP 15 Rotor housing 1 Order Part name Q ty Remarks ...
Page 161: ...5 29 STEERING 9 Bearing race 2 Refer to removal section Order Part name Q ty Remarks ...
Page 170: ...5 38 REAR SHOCK ABSORBER 12 Bearing 2 Refer to removal section Order Part name Q ty Remarks ...
Page 191: ......