
CARBURETOR
7-9
5. Install:
•
Pilot jet “1”
•
Main jet “2”
6. Install:
•
Needle valve “1”
•
Float “2”
•
Float pin “3”
TIP
•
After installing the needle valve to the float, in-
stall them to the carburetor.
•
Check the float for smooth movement.
7. Install:
•
Float chamber “1”
•
Plate “2”
•
Screw (float chamber) “3”
8. Install:
•
Air vent hose [L = 580 mm (22.8 in)] “1”
•
Air vent hose [L = 400 mm (15.7 in)] “2”
•
Overflow hose [L = 280 mm (11.0 in)] “3”
•
Clamp “4”
Refer to “CABLE ROUTING DIAGRAM” on
TIP
Install the air vent hoses and overflow hose to
the carburetor with their ends not having the cuts
“a” toward the carburetor.
9. Install:
•
Jet needle “1”
•
Collar “2”
•
Spring “3”
•
Jet needle holder “4”
(to the throttle valve “5”)
TIP
Install the spring with its smaller dia. “a” facing
the collar.
10.Install:
•
Throttle cable “1”
•
Locknut “2”
•
Mixing chamber top “3”
•
Spring (throttle valve) “4”
•
Ring “5”
•
Throttle valve “6”
TIP
•
While compressing the spring, connect the
throttle cable.
•
Align the projection “a” on the ring with the
groove “b” in the jet needle holder “7”.
Locknut (throttle cable carburetor
side)
4.0 N·m (0.40 kgf·m, 3.0 lb·ft)
T
R
.
.
Summary of Contents for YZ250 2022
Page 5: ...EAM20162 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 8: ......
Page 10: ......
Page 38: ...MOTORCYCLE CARE AND STORAGE 1 26...
Page 54: ...CABLE ROUTING DIAGRAM 2 15 EAM20152 CABLE ROUTING DIAGRAM Frame and engine left side view...
Page 56: ...CABLE ROUTING DIAGRAM 2 17 Frame and engine left side view...
Page 58: ...CABLE ROUTING DIAGRAM 2 19 Frame and engine right side view...
Page 60: ...CABLE ROUTING DIAGRAM 2 21 Handlebar front view 0 mm 0 in 0 mm 0 in...
Page 62: ...CABLE ROUTING DIAGRAM 2 23 Rear brake right side view...
Page 64: ...CABLE ROUTING DIAGRAM 2 25...
Page 92: ...ELECTRICAL SYSTEM 3 26...
Page 160: ...CHAIN DRIVE 4 66...
Page 193: ...CLUTCH 5 31 2 1...
Page 233: ...ELECTRICAL COMPONENTS 8 6 EAM30289 CHECKING THE SWITCHES 1 1 Engine stop switch...
Page 254: ...TROUBLESHOOTING 9 13...
Page 261: ...ENGINE 10 6...
Page 274: ......