2-14
SPEC
CABLE ROUTING DIAGRAM
J
Clamp the CDI magneto lead,
radiator breather hose and
YPVS breather hose to the
frame.
K
Clamp to the frame the CDI
magneto lead and radiator
breather hose. Take care to
clamp them above the projec-
tion on the frame.
L
Locate the clamp ends in the
arrowed range.
M
Pass the air vent hose, over-
flow hose and crankcase
breather hose so that they do
not contact the rear shock
absorber.
N
Bring the connector cover into
contact with the coupler.
1C3-9-31-2B 5/11/05 9:50 AM Page 28
Summary of Contents for YZ125(V)
Page 570: ...TUN MEMO...