6-4
IGNITION SYSTEM
2. Inspect:
• Charging coil 1 resistance
Out of specification
→
Replace.
3. Inspect:
• Charging coil 2 resistance
Out of specification
→
Replace.
CHECKING THE CDI UNIT
Check all electrical components. If no
fault is found, replace the CDI unit.
Then check the electrical compo-
nents again.
Tester (+) lead
→
Black/Red lead
"1"
Tester (-) lead
→
Green/White lead
"2"
Charging
coil 1 resis-
tance
Tester se-
lector posi-
tion
720.0–
1,080.0
Ω
at 20 °C (68
°F)
Ω
× 100
Tester (+) lead
→
Green/Blue lead
"1"
Tester (-) lead
→
Black lead "2"
Charging
coil 2 resis-
tance
Tester se-
lector posi-
tion
44.0–66.0
Ω
at 20 °C
(68 °F)
Ω
× 10
Summary of Contents for YZ125 2015
Page 4: ......
Page 12: ...1 2 LOCATION OF IMPORTANT LABELS EUROPE...
Page 13: ...1 3 LOCATION OF IMPORTANT LABELS AUS NZ ZA...
Page 61: ...3 18 CHASSIS...
Page 165: ......
Page 166: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER...