FUEL INJECTION SYSTEM
8-47
Fault code No.
46
Item
Charging voltage is abnormal.
Fail-safe system
Able/Unable to start engine
Able/Unable to drive vehicle
Diagnostic code No.
—
Diagnostic tool display
—
Procedure
—
Item Probable cause of malfunc-
tion and check
Maintenance job
Confirmation of service
completion
1
Connection of wire harness
ECU coupler.
Check the locking condition
of the coupler.
Disconnect the coupler and
check the pins (bent or bro-
ken terminals and locking
condition of the pins).
Improperly connected
Connect the coupler securely
or repair/replace the wire har-
ness.
Start the engine and let it idle
for approximately 5 seconds.
Fault code number is not dis-
played
Service is finished.
Fault code number is dis-
played
Go to item 2.
2
Wire harness continuity.
Open or short circuit
Re-
place the wire harness.
Between rectifier/regulator
coupler and ECU coupler.
red–red
Between battery terminal and
ECU coupler.
red–red
Start the engine and let it idle
for approximately 5 seconds.
Fault code number is not dis-
played
Service is finished.
Fault code number is dis-
played
Go to item 3.
3
Defective AC magneto.
Check the AC magneto.
Defective AC magneto
Re-
place.
Start the engine and let it idle
for approximately 5 seconds.
Fault code number is not dis-
played
Service is finished.
Fault code number is dis-
played
Go to item 4.
4
Malfunction in ECU.
Replace the ECU.
Summary of Contents for YZ 2017 Series
Page 6: ...EASB916006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 63: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 72: ...CABLE ROUTING DIAGRAM 2 31 EASB29B065 CABLE ROUTING DIAGRAM...
Page 74: ...CABLE ROUTING DIAGRAM 2 33...
Page 76: ...CABLE ROUTING DIAGRAM 2 35...
Page 78: ...CABLE ROUTING DIAGRAM 2 37...
Page 80: ...CABLE ROUTING DIAGRAM 2 39...
Page 82: ...CABLE ROUTING DIAGRAM 2 41...
Page 84: ...CABLE ROUTING DIAGRAM 2 43...
Page 86: ...CABLE ROUTING DIAGRAM 2 45...
Page 198: ...CHAIN DRIVE 4 70...
Page 262: ...OIL PUMP AND BALANCER GEAR 5 61 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6...
Page 319: ...CHARGING SYSTEM 8 15...
Page 327: ...COOLING SYSTEM For JPN 8 23...
Page 359: ...FUEL PUMP SYSTEM 8 55...
Page 360: ...ELECTRICAL COMPONENTS 8 56 EASB29B345 ELECTRICAL COMPONENTS EASB29B346 9 10 11 1 3 2 4 5 6 7 8...
Page 362: ...ELECTRICAL COMPONENTS 8 58 11 10 9 2 3 1 6 7 8 4 5...
Page 364: ...ELECTRICAL COMPONENTS 8 60 EASB29B347 CHECKING THE SWITCHES 4 1 3 2 B B Sb B B B B B B B B...