CYLINDER HEAD
5-22
EASB296222
INSTALLING THE CYLINDER HEAD
1. Install:
• Timing chain guide (intake side) “1”
• Dowel pin “2”
• Cylinder head gasket “3”
• Cylinder head “4”
TIP
• Install the cylinder head gasket with its char-
acter stamp “a” rearward of the vehicle as
shown.
• While pulling up the timing chain, install the
timing chain guide (intake side) and the cylin-
der head.
2. Install:
• Washer “1”
• Cylinder head bolt “2”
• Cylinder head nut “3”
TIP
Apply molybdenum disulfide grease to the
threads and contact surfaces of the bolts and to
both contact surfaces of the washers.
3. Tighten:
• Cylinder head bolt “1” – “4”
• Cylinder head nut “5”, “6”
TIP
Tighten the bolts and nuts to the specified
torque in two or three steps in the proper tight-
ening sequence as shown.
Cylinder head bolt “1” – “4”
33 Nm (3.3 m·kgf, 24 ft·lbf)
Cylinder head nut “5”, “6”
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
New
1
2
2
4
3
a
1
3
2
2
T
R
.
.
1
5
6
4
2
3
FWD
x2
x4
Summary of Contents for YZ 2016 Series
Page 6: ...EASB296006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 31: ...CONTROL FUNCTIONS 1 19 a 2...
Page 63: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 72: ...CABLE ROUTING DIAGRAM 2 31 EASB296066 CABLE ROUTING DIAGRAM...
Page 74: ...CABLE ROUTING DIAGRAM 2 33...
Page 76: ...CABLE ROUTING DIAGRAM 2 35...
Page 78: ...CABLE ROUTING DIAGRAM 2 37...
Page 80: ...CABLE ROUTING DIAGRAM 2 39...
Page 82: ...CABLE ROUTING DIAGRAM 2 41...
Page 84: ...CABLE ROUTING DIAGRAM 2 43...
Page 86: ...CABLE ROUTING DIAGRAM 2 45...
Page 262: ...OIL PUMP AND BALANCER GEAR 5 63 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6...
Page 282: ...TRANSMISSION 5 83...
Page 302: ...8 CHECKING THE INTAKE AIR TEMPERATURE SENSOR 8 68 CHECKING THE FUEL INJECTOR 8 68...
Page 317: ...CHARGING SYSTEM 8 15...
Page 321: ...COOLING SYSTEM For JPN 8 19...
Page 351: ...FUEL PUMP SYSTEM 8 49...
Page 352: ...ELECTRICAL COMPONENTS 8 50 EASB296346 ELECTRICAL COMPONENTS EASB296347 7 8 9 1 3 2 4 5 6...
Page 354: ...ELECTRICAL COMPONENTS 8 52 11 10 9 2 3 1 6 7 8 4 5...
Page 356: ...ELECTRICAL COMPONENTS 8 54 EASB296348 CHECKING THE SWITCHES 4 1 3 2 B B Sb B B B B B B B B...
Page 378: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...