ENGINE
3-13
7. Install:
• Air filter case cover “1”
TIP
Align the air filter case cover groove “a” with the
air filter case edge “b”.
8. Install:
• Fuel tank cap cover
EASB296082
CHECKING THE THROTTLE BODY JOINT
1. Check:
• Throttle body joint
Refer to “CHECKING THE THROTTLE
BODY JOINT” on page 7-8.
EASB296083
CHECKING THE BREATHER HOSES
1. Check:
• Breather hose “1”
Crack/damage
Replace.
Loose connection
Connect properly.
ECA
NOTICE
Make sure the cylinder head breather hose
is routed correctly.
EASB296084
CHECKING THE EXHAUST SYSTEM
1. Remove:
• Exhaust pipe protector
2. Check:
• Exhaust pipe 1
• Exhaust pipe 2
• Silencer
Crack/damage
Replace.
Refer to “ENGINE REMOVAL” on page 5-1.
• Exhaust gas
Leaks
Replace the gasket.
Refer to “ENGINE REMOVAL” on page 5-1.
3. Check:
• Tightening torques
4. Install:
• Exhaust pipe protector
3
1
2
a
b
1
1
1
1
Exhaust pipe bolt 1 and nut “1”
20 Nm (2.0 m·kgf, 14 ft·lbf)
Exhaust pipe 1 and exhaust pipe
2 bolt “2”
12 Nm (1.2 m·kgf, 8.7 ft·lbf)
Exhaust pipe 2 and silencer bolt
“3”
12 Nm (1.2 m·kgf, 8.7 ft·lbf)
Silencer and silencer bracket bolt
“4”
30 Nm (3.0 m·kgf, 22 ft·lbf)
Exhaust pipe protector screw
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
LOCTITE®
T
R
.
.
2
1
4
3
T
R
.
.
Summary of Contents for YZ 2016 Series
Page 6: ...EASB296006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 31: ...CONTROL FUNCTIONS 1 19 a 2...
Page 63: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 72: ...CABLE ROUTING DIAGRAM 2 31 EASB296066 CABLE ROUTING DIAGRAM...
Page 74: ...CABLE ROUTING DIAGRAM 2 33...
Page 76: ...CABLE ROUTING DIAGRAM 2 35...
Page 78: ...CABLE ROUTING DIAGRAM 2 37...
Page 80: ...CABLE ROUTING DIAGRAM 2 39...
Page 82: ...CABLE ROUTING DIAGRAM 2 41...
Page 84: ...CABLE ROUTING DIAGRAM 2 43...
Page 86: ...CABLE ROUTING DIAGRAM 2 45...
Page 262: ...OIL PUMP AND BALANCER GEAR 5 63 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6...
Page 282: ...TRANSMISSION 5 83...
Page 302: ...8 CHECKING THE INTAKE AIR TEMPERATURE SENSOR 8 68 CHECKING THE FUEL INJECTOR 8 68...
Page 317: ...CHARGING SYSTEM 8 15...
Page 321: ...COOLING SYSTEM For JPN 8 19...
Page 351: ...FUEL PUMP SYSTEM 8 49...
Page 352: ...ELECTRICAL COMPONENTS 8 50 EASB296346 ELECTRICAL COMPONENTS EASB296347 7 8 9 1 3 2 4 5 6...
Page 354: ...ELECTRICAL COMPONENTS 8 52 11 10 9 2 3 1 6 7 8 4 5...
Page 356: ...ELECTRICAL COMPONENTS 8 54 EASB296348 CHECKING THE SWITCHES 4 1 3 2 B B Sb B B B B B B B B...
Page 378: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...