2 - 24
SPEC
CABLE ROUTING DIAGRAM
1
Throttle cable
2
Light switch
3
Light switch lead
4
Clamp
5
Decompression cable
6
Clutch cable
7
Hose guide
8
Trip meter
9
Brake hose
0
Engine stop switch lead
Å
Fasten the engine stop switch lead to the handlebar with the plastic
band.
ı
Pass the throttle cables between the upper bracket and trip meter.
Ç
Pass the light switch leads behind the engine stop switch lead, then
pass the headlight lead (of the light switch leads) in front of the head
pipe.
Î
Install the trip meter cable so that its bent portion faces the chassis
rear.
‰
Install the brake hose so that it contacts the master cylinder projec-
tion and that its bent portion faces downward.
Summary of Contents for WR250
Page 604: ...5 67 CHAS REAR SHOCK ABSORBER 8 Install Band 1 Taillight connector 2 ...
Page 692: ......
Page 693: ......