8-13
Drive belt
To remove the drive belt:
1. Set the drive select lever halfway be-
tween forward and reverse.
2. Pull up on the drive belt and push it out-
ward over the edge of the secondary
sheave.
3. Turn the secondary sheave clockwise
and the drive belt will roll off the sheave.
4. Remove the drive belt from the primary
sheave.
Inspection:
To inspect the drive belt, check for frayed edges
or tears, and measure the drive belt as shown.
If the belt shows excessive wear or damage or
if it reaches the wear limit of 27.9 mm (1.10 in),
replace the belt with a new one.
a. Wear limit
5. To install the drive belt, reverse the
above steps.
NOTE:
Roll the drive belt over the secondary sheave
when installing.
Y-60
a
UJU510.book Page 13 Tuesday, May 18, 2004 11:28 AM
Summary of Contents for U-MAX G23A
Page 1: ......
Page 2: ......
Page 82: ...B6 fm Page 1 Monday June 18 2001 11 18 AM ...
Page 83: ......
Page 84: ......