CABLE ROUTING DIAGRAM
2-16
SPEC
1
Tachometer assembly
2
Coupler for speed shift
3
CDI unit
4
Voltage regulator
5
Servomotor
6
Brake hose holder
7
Reservoir hose
8
Rear brake hose
9
Clamp
A
Install the tachometer assembly with its figures standing upright.
B
Do not make the clamp grip face outside of the chassis.
C
Position the reservoir hose with its paint mark upward.
D
Be sure the brake hose is not twisted.
E
Do not cut the end of the clamp.
Summary of Contents for TZ250M
Page 1: ...5KE 28199 10 LIT 11626 13 41 OWNER S SERVICE MANUAL TZ250M1 M ...
Page 11: ...MEMO ...
Page 15: ...CHAPTER 7 TUNING ENGINE 7 1 CHASSIS 7 14 ...
Page 287: ...99 9 0 1x1 ...