TF5/TF3/TF1
151
7-10-2. SW_PNC
[Contents]
Inspect the switches on the PNC circuit board.
It judges by detecting operation of the target switches.
[Procedure]
<GUI>
Operate switches on sheet PNC.
ABORT
Popup dialog as shown in the above
fi
gure is displayed on
the screen. Operate the switches which have been the targets
of the inspection.
LED built in the target switch turns on. If operation is
detected, LED will turn off.
The following LEDs are substituted for the switch built in
the encoder.
UDEF KNOB A –> METER -25
UDEF KNOB B –> METER -30
UDEF KNOB C –> METER -40
UDEF KNOB D –> METER -50
TOUCH AND TURN KNOB –> METER -60
If operation of all the switches is detected, popup dialog will
be closed automatically.
When popup dialog does not close in spite of having operated
it, push the
[ABORT]
button. Close the popup dialog.
7-10-3. SW_PNFD1
[Contents]
Inspect the switches on the PNFD1 circuit board.
It judges by detecting operation of the target switches.
[Procedure]
<GUI>
Operate switches on sheet PNFD1.
ABORT
Popup dialog as shown in the above
fi
gure is displayed on
the screen. Operate the switches which have been the targets
of the inspection.
LED built in the target switch turns on. If operation is
detected, LED will turn off.
If operation of all the switches is detected, popup dialog will
be closed automatically.
When popup dialog does not close in spite of having operated
it, push the
[ABORT]
button. Close the popup dialog.
7-10-4. SW_PNF
[Contents]
Inspect the switches on the PNF circuit board.
It judges by detecting operation of the target switches.
[Procedure]
<GUI>
Operate switches on sheet PNF.
ABORT
Popup dialog as shown in the above
fi
gure is displayed on
the screen. Operate the switches which have been the targets
of the inspection.
LED built in the target switch turns on. If operation is
detected, LED will turn off.
If operation of all the switches is detected, popup dialog will
be closed automatically.
When popup dialog does not close in spite of having operated
it, push the
[ABORT]
button. Close the popup dialog.
7-10-5. SW_FD8_1 (CH1-CH8)
[Contents]
Inspect the switches on the PNFD8 circuit board (CH1-8).
It judges by detecting operation of the target switches. "
[Procedure]
<GUI>
Operate switches on sheet FD8(CH01-08).
ABORT
Popup dialog as shown in the above
fi
gure is displayed on
the screen. Operate the switches which have been the targets
of the inspection.
LED built in the target switch turns on. If operation is
detected, LED will turn off.
If operation of all the switches is detected, popup dialog will
be closed automatically.
When popup dialog does not close in spite of having operated
it, push the
[ABORT]
button. Close the popup dialog.
7-10-6. SW_FD8_2 (CH9-CH16)
7-10-7. SW_FD8_3 (CH17-CH24)
7-10-8. SW_FD8_4 (CH25-CH32)
[Contents]
Although the target of the inspection replaces CH9-16,
CH17-24 or CH25-32, the contents are the same as that of
“
7-10-5. SW_FD8_1
”.
“
7-10-7. SW_FD8_3
” function is for TF5 and TF3.
“
7-10-8. SW_FD8_4
” function is for TF5 only.
Summary of Contents for TF1
Page 10: ...10 TF5 TF3 TF1 866 716 225 599 225 599 TF5 TF3 Unit 単位 mm Unit 単位 mm DIMENSIONS 寸法図 ...
Page 11: ...11 TF5 TF3 TF1 225 510 599 TF1 Unit 単位 mm ...
Page 110: ...B B MAIN MAINCOM Circuit Board 2NA0 ZJ06330 3 110 TF5 TF3 TF1 ...
Page 111: ...B B Scale 90 100 Pattern side パターン側 2NA0 ZJ06330 3 111 TF5 TF3 TF1 ...
Page 113: ...WR 1 WR 1 DA2 Circuit Board Scale 90 100 Component side 部品側 2NA ZJ06430 2 113 TF5 TF3 TF1 ...
Page 116: ...WR 1 WR 1 7 WR 32 5 6 C C PS Circuit Board 2NA ZJ06320 2 116 TF5 TF3 TF1 ...
Page 119: ...Component side 部品側 D D Component side 部品側 2NA ZJ06380 4 119 TF5 TF3 TF1 ...