5-7
COOL
COOLING SYSTEM
2
1
4
3
3. Remove:
9
impeller
1
9
bearing
2
NOTE:
Remove the bearing from the outside of the
water pump housing.
3
Water pump housing
EAS00473
CHECKING THE WATER PUMP
1. Check:
9
water pump housing cover
9
water pump housing
9
impeller
9
rubber damper
9
rubber damper holder
9
water pump seal
9
oil seal
Cracks/damage/wear
→
Replace.
4. Remove:
9
water pump seal
4
NOTE:
Remove the water pump seal from the inside of
the water pump housing.
2. Check:
9
bearing
Rough movement
→
Replace.
2. Remove:
9
plate
NOTE:
Slide the plate as shown, and then remove the
plate from the water pump housing.
http://www.motorcycle.in.th
Summary of Contents for T135SE
Page 2: ...http www motorcycle in th ...
Page 6: ...http www motorcycle in th ...
Page 8: ...http www motorcycle in th ...
Page 10: ...http www motorcycle in th ...
Page 12: ...GEN INFO http www motorcycle in th ...
Page 22: ...SPEC http www motorcycle in th ...
Page 106: ...ENG http www motorcycle in th ...
Page 198: ...ENG http www motorcycle in th ...
Page 200: ...COOL http www motorcycle in th ...
Page 212: ...CARB http www motorcycle in th ...
Page 290: ...CHAS http www motorcycle in th ...
Page 292: ...ELEC http www motorcycle in th ...
Page 296: ...ELEC CHECKING SWITCH CONTINUITY 8 4 http www motorcycle in th ...
Page 340: ...ELEC http www motorcycle in th ...
Page 342: ...TRBL SHTG http www motorcycle in th ...
Page 346: ...TRBL SHTG http www motorcycle in th ...
Page 347: ...http www motorcycle in th ...
Page 348: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN http www motorcycle in th ...