ENG
4-65
CRANKCASE AND CRANKSHAFT
5. Remove:
9
crankcase bolts
NOTE:
Loosen each bolt 1/4 of a turn at a time, in
stages and in a crisscross pattern. After all of
the bolts are fully loosened, remove them.
6. Remove:
9
right crankcase
9
dowel pins
c
C
Tap on one side of the crankcase with a soft-
face hammer. Tap only on reinforced por-
tions of the crankcase, not on the crankcase
mating surfaces. Work slowly and carefully
and make sure the crankcase halves sepa-
rate evenly.
7. Remove:
9
crankshaft assembly
NOTE:
Use the crankcase separating tool.
w
Never use the hammer to tapping and
removing the crankshaft directory.
EAS00394
CHECKING THE CRANKSHAFT AND
CONNECTING ROD
1. Measure:
9
crankshaft runout
Out of specification
→
Replace the crank-
shaft, bearing or both.
NOTE:
Turn the crankshaft slowly.
Maximum crankshaft runout
0.03 mm (0.0012 in)
Crankcase separating tool:
90890-01135
http://www.motorcycle.in.th
Summary of Contents for T135SE
Page 2: ...http www motorcycle in th ...
Page 6: ...http www motorcycle in th ...
Page 8: ...http www motorcycle in th ...
Page 10: ...http www motorcycle in th ...
Page 12: ...GEN INFO http www motorcycle in th ...
Page 22: ...SPEC http www motorcycle in th ...
Page 106: ...ENG http www motorcycle in th ...
Page 198: ...ENG http www motorcycle in th ...
Page 200: ...COOL http www motorcycle in th ...
Page 212: ...CARB http www motorcycle in th ...
Page 290: ...CHAS http www motorcycle in th ...
Page 292: ...ELEC http www motorcycle in th ...
Page 296: ...ELEC CHECKING SWITCH CONTINUITY 8 4 http www motorcycle in th ...
Page 340: ...ELEC http www motorcycle in th ...
Page 342: ...TRBL SHTG http www motorcycle in th ...
Page 346: ...TRBL SHTG http www motorcycle in th ...
Page 347: ...http www motorcycle in th ...
Page 348: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN http www motorcycle in th ...