Perio
d
ic maintenance an
d
a
d
justment
8-10
8
2. Slide the cowling as shown.
3. Remove the upper projections
from the slots, and then slide the
cowling forward.
To install the cowling
1. Slide the cowling rearward, and
then fit the upper projections into
the slots.
2. Slide the cowling as shown.
3. Install the bolts, quick fasteners,
and quick fastener screw.
TIP
Install the bolts loosely, then install the
quick fasteners and quick fastener
screw, and then tighten the bolts.
Cowlin
g
B
To remove the cowling
1. Remove cowling A.
2. Remove cowling B by removing
the bolts.
1. Quick fastener
1. Cowling A
1
1
1. Cowling A
1. Cowling A
1
1
1. Cowling A
1
UBN61CE0.book Page 10 Monday, October 31, 2022 11:50 AM