87
SPEC
Y
Fasten the tail/brake light lead
and brake hose to the frame rear
cross member with the plastic
band. Install the plastic band with
its buckle positioned towards the
rear of the machine and its end
facing to the right.
Z
40 ~ 50 mm (1.6 ~ 2.0 in)
[
Parking brake cable
\
Gear motor lead coupler
(PZ50GT/PZ50RT/PZ50MT/
PZ50VT/PZ50MP)
]
Fasten the wire harness, brake
hose, and parking brake cable
with the plastic band.
_
Battery
a
Fuse box
b
Main fuse
c
Starter relay
d
Starter relay lead
e
Load control relay
f
Fuel injection system relay
g
Headlight relay
h
Radiator fan motor relay
i
Gear motor relay 1 (PZ50GT/
PZ50RT/PZ50MT/PZ50VT/
PZ50MP)
j
Gear motor relay 2 (PZ50GT/
PZ50RT/PZ50MT/PZ50VT/
PZ50MP)
k
Gear motor relay 3 (PZ50GT/
PZ50RT/PZ50MT/PZ50VT/
PZ50MP)
l
Passenger grip warmer relay
(PZ50VT/PZ50MP)
Summary of Contents for PZ50GTX
Page 42: ...36 FI ...
Page 70: ...64 SPEC CABLE ROUTING F G H I J K L 7 9 8 A B C 0 D E 1 2 3 4 6 M N O P Q R S T U V W X Z Y 5 ...
Page 72: ...66 SPEC CABLE ROUTING F G H I J K L 7 9 8 A B C 0 D E 1 2 3 4 6 M N O P Q R S T U V W X Z Y 5 ...
Page 74: ...68 SPEC CABLE ROUTING 1 2 3 4 5 6 2 ...
Page 106: ...100 SPEC CABLE ROUTING 1 2 3 4 5 6 ...
Page 108: ...102 SPEC CABLE ROUTING 9 0 1 2 3 4 5 5 6 7 8 PZ50 PZ50GT PZ50RT PZ50MT PZ50VT PZ50MP ...