93
SPEC
f
Fasten the corrugated tube
(engine stop switch lead, throttle
switch lead, right grip warmer
lead, and thumb warmer lead),
corrugated tube (left grip warmer
lead, grip/thumb warmer adjust-
ment switch lead, brake light
switch lead, and headlight beam
switch lead), parking brake
cable, throttle cable, speedome-
ter unit lead, and brake hose with
the plastic band.
g
Install the plastic band with its
buckle positioned behind the
leads, cables, and hose and its
end facing to the right. Be sure to
position the corrugated tube
(engine stop switch lead, throttle
switch lead, right grip warmer
lead, and thumb warmer lead)
and corrugated tube (left grip
warmer lead, grip/thumb warmer
adjustment switch lead, brake
light switch lead, and headlight
beam switch lead) towards the
front and fasten the throttle cable
at the throttle cable adjusting nut.
h
Position the corrugated tube
(engine stop switch lead, throttle
switch lead, right grip warmer
lead, and thumb warmer lead)
and corrugated tube (left grip
warmer lead, grip/thumb warmer
adjustment switch lead, brake
light switch lead, and headlight
beam switch lead) towards the
front of the guide.
i
10 mm (0.39 in)
j
Steering pad
k
Install the steering pad, making
sure not to pinch the cables,
leads, etc.
Summary of Contents for PZ50GTX
Page 42: ...36 FI ...
Page 70: ...64 SPEC CABLE ROUTING F G H I J K L 7 9 8 A B C 0 D E 1 2 3 4 6 M N O P Q R S T U V W X Z Y 5 ...
Page 72: ...66 SPEC CABLE ROUTING F G H I J K L 7 9 8 A B C 0 D E 1 2 3 4 6 M N O P Q R S T U V W X Z Y 5 ...
Page 74: ...68 SPEC CABLE ROUTING 1 2 3 4 5 6 2 ...
Page 106: ...100 SPEC CABLE ROUTING 1 2 3 4 5 6 ...
Page 108: ...102 SPEC CABLE ROUTING 9 0 1 2 3 4 5 5 6 7 8 PZ50 PZ50GT PZ50RT PZ50MT PZ50VT PZ50MP ...